Railway Traffic Control System Using Removal Codes

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Despite existing safety features, railway accidents involving workers still occur due to inadequate protection during track maintenance and operations, highlighting the need for enhanced safety measures in railway traffic control systems.

Innovation Solution

A centralized railway control system is adapted to include a user interface that allows railway field workers to block and unblock track sections electronically, using a removal code system to ensure safe access and egress, with automated code generation and transmission, and voice or speech interfaces for ease of use.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If a centralized traffic control system is used to monitor and control train traffic, then train traffic control and safety are improved, but the complexity of the control system increases

Engineering Contradiction:
Improvetrain traffic control safetyVSAvoidcontrol system complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The control system is segmented into functional modules: a block placement module for setting blocks, a code generation module for creating removal codes, a communication module for transmitting codes to workers, and a block removal module for deleting blocks. This segmentation allows each module to perform its specific function independently, managing system complexity while maintaining comprehensive safety control.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

A removal code acts as an intermediary mechanism between the control system and field workers. The code is generated by the system, transmitted to the worker, and required for block removal. This intermediary layer adds a safety verification step without requiring direct complex communication protocols between all system components and workers.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Device complexity

If manual block placement and removal procedures are used, then system complexity is reduced, but worker safety and operational efficiency deteriorate

Engineering Contradiction:
Improvecontrol system complexityVSAvoidworker safety
Core Design Contradiction:
Device complexityVSReliability

Solution Approach 1:

The system enables field workers to independently manage block placement and removal through their own devices (mobile phones, tablets, or computers). Workers receive removal codes via communication and can autonomously remove blocks by entering the codes, eliminating the need for constant manual intervention by control center personnel while maintaining safety through automated verification.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

Manual mechanical block placement and removal procedures are replaced with electronic digital operations. Instead of physical signals or manual communications, the system uses electronic code generation, transmission, and verification to control block status, improving safety through automated verification while reducing the physical complexity of on-site operations.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

3Reliability

If automated code generation and transmission is implemented, then worker safety is improved, but the complexity of code management increases

Engineering Contradiction:
Improveworker safetyVSAvoidcode management complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The system generates unique, single-use removal codes for each block placement operation. These codes are temporary and expire or become invalid after use. This approach simplifies code management by ensuring that each code is used only once for its specific purpose, eliminating the need for complex code reuse management while maintaining high security and worker safety.

Inventive Principle:
Principle #27Cheap short-living objects (Disposable)

Solution Approach 2:

The system implements feedback mechanisms where the control system tracks which codes have been issued and used. When a worker enters a removal code, the system verifies it against the generated codes and provides confirmation. This feedback loop ensures correct code usage without requiring workers to manage complex code inventories, as the system automatically validates and tracks code status.

Inventive Principle:
Principle #23Feedback

4Productivity

If field workers can independently remove blocks using received codes, then operational efficiency is improved, but the risk of unauthorized access increases

Engineering Contradiction:
Improveoperational efficiencyVSAvoidunauthorized access risk
Core Design Contradiction:
ProductivityVSObject-affected harmful factors

Solution Approach 1:

The system performs preliminary actions by generating and transmitting unique removal codes to field workers before they need to remove blocks. These codes are prepared in advance and stored securely in workers' devices. When block removal is needed, the pre-generated codes are verified automatically, allowing workers to act independently without real-time authorization while maintaining security through advance code preparation and verification.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUSRE49115E1Tools for railway traffic control
Publication Date: 2022.06.28 RAILWARE
  • USRE49115E1 patent drawing
  • USRE49115E1 patent drawing
  • USRE49115E1 patent drawing

AI summary

Tools (such as system, apparatus, methodology, etc.) may be provided to control traffic over a railway track section, and more particularly, when a railway worker is working on or near the track section, a block is placed to prevent trains from traversing the track section. Move particularly, when traffic over the track section is to be blockedFurther, a release code is generated and sent to an electronic contact address of the railway worker. Traffic through the track section is blocked until the release code is entered in the systema user terminal. The block is removed from the track section when the release code is received by the system.