Automated RAN Hardware Decommissioning and Commissioning

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current systems lack an automated method for decommissioning old hardware and commissioning new hardware in radio access networks (RAN), leading to inefficient use of system resources due to the lack of timely reallocation of resources.

Innovation Solution

An automated system that monitors RAN equipment, identifies malfunctioning units, initiates decommissioning of the faulty equipment, and commissions replacement equipment, ensuring timely reallocation of system resources through an integrated equipment monitoring system and operational support system.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If manual decommissioning and commissioning processes are used, then system resource reallocation can be controlled and approved, but the process is time-consuming and leads to inefficient use of system support resources

Engineering Contradiction:
Improvesystem resource reallocation efficiencyVSAvoidtime for decommissioning and commissioning
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The system performs preliminary actions by automatically detecting equipment failures and initiating decommissioning/commissioning workflows before manual intervention is completed. The automated system prepares and submits decommissioning requests, obtains approvals, and coordinates resource reallocation in advance, reducing the overall time required for the process.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system enables self-service by allowing the automated monitoring system to independently detect failures, generate decommissioning requests, obtain approvals through automated workflows, and coordinate with the resource management system for reallocation. This self-service capability eliminates manual intervention delays and significantly improves processing efficiency.

Inventive Principle:
Principle #25Self-service

2Productivity

If automated decommissioning and commissioning is implemented, then resource reallocation speed is improved, but system complexity increases due to integration requirements

Engineering Contradiction:
Improvehardware replacement efficiencyVSAvoidsystem integration complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The patent introduces an intermediary automated system that acts as a mediator between the equipment monitoring system and the resource management system. This intermediary component handles the complex integration tasks, including automated detection, workflow coordination, approval processes, and resource reallocation signaling, thereby managing system complexity while maintaining high productivity.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Productivity

If timely decommissioning is performed, then system resource utilization is optimized, but the risk of service disruption increases during the transition period

Engineering Contradiction:
Improvesystem resource utilizationVSAvoidservice continuity during replacement
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The system performs preliminary actions by obtaining approvals and preparing resource reallocation plans before actually decommissioning the old equipment. This ensures that all necessary preparations are completed in advance, minimizing the risk of service disruption during the actual transition period while maintaining optimized resource utilization.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system provides beforehand cushioning by implementing approval workflows and coordination mechanisms that buffer against potential service disruptions. The automated system ensures that decommissioning only proceeds after proper approvals are obtained and resource reallocation is coordinated, creating a protective layer that maintains service reliability during the transition.

Inventive Principle:
Principle #11Beforehand cushioning (Prior cushioning)

Data Source

PatentUS20240334202A1System resource management through automated hardware decommissioning and commissioning
Publication Date: 2024.10.03 RAKUTEN SYMPHONY INC
  • US20240334202A1 patent drawing
  • US20240334202A1 patent drawing
  • US20240334202A1 patent drawing

AI summary

Provided is a system and method for managing resources of a radio access network (RAN) which includes: monitoring the RAN; identifying a piece of equipment within the RAN that is not functioning in a normal manner; based on identifying the piece of equipment that is not functioning in a normal manner, initiating an alert to a user and generating a request to decommission the identified piece of equipment; requesting approval of the request to decommission the identified piece of equipment and to commission a replacement for the identified piece of equipment; and, based on receiving approval of the request to decommission the identified piece of equipment and to commission a replacement for the identified piece of equipment, initiating decommissioning of the identified piece of equipment and commissioning of the replacement for the identified piece of equipment.