Reliability-Based Control Green Zone for AGC Compliance

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing energy management systems face challenges in maintaining compliance with NERC control performance standards, particularly in balancing area control error (ACE) and frequency regulation, leading to potential violations and inefficiencies in power distribution.

Innovation Solution

The implementation of an advanced reliability-based control (RBC) system that enhances automatic generation control (AGC) by introducing a novel RBC green zone concept, which uses operator-enterable ACE limits, predictive BAAL control, and coordinated control efforts to maintain system stability and compliance with NERC standards, ensuring safe operation within defined limits.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If existing automatic generation control systems are used to maintain frequency and area control error compliance, then basic power distribution control is achieved, but compliance violations occur and system reliability is insufficient

Engineering Contradiction:
Improvecompliance reliabilityVSAvoidcontrol system complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The control system is segmented into multiple functional modules including a green zone determination module that calculates safe operating zones based on NERC standards, a control execution module that implements corrective actions, and a monitoring module that tracks compliance status. This modular segmentation allows the complex control logic to be distributed and managed more effectively, improving reliability without overwhelming system complexity.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system performs preliminary actions by determining green zones and safety margins before compliance violations occur. The green zone determination module proactively calculates acceptable operating ranges based on predictive algorithms and NERC standards, allowing the system to take preventive control actions that maintain compliance reliability while managing complexity through advance planning.

Inventive Principle:
Principle #10Preliminary action

2Manufacturing precision

If conventional AGC control methods are applied, then basic area control error correction is achieved, but ACE violations occur and control precision is insufficient

Engineering Contradiction:
Improvecontrol precisionVSAvoidcontrol mechanism complexity
Core Design Contradiction:
Manufacturing precisionVSDevice complexity

Solution Approach 1:

The control mechanism incorporates multiple feedback loops that continuously monitor area control error, frequency deviations, and green zone boundaries. The system uses this feedback to dynamically adjust generator outputs and maintain precise control within acceptable margins, achieving high control precision while managing complexity through structured feedback processing.

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The system changes control parameters dynamically by adjusting generator setpoints, modulation rates, and control weights based on real-time system conditions and green zone calculations. This parameter adaptation allows precise control to be maintained across varying operating conditions without requiring a fundamentally more complex control architecture.

Inventive Principle:
Principle #35Parameter changes

3Reliability

If NERC control performance standards are strictly enforced, then compliance is achieved, but system adaptability and operational flexibility are reduced

Engineering Contradiction:
Improvestandard complianceVSAvoidoperational flexibility
Core Design Contradiction:
ReliabilityVSAdaptability or versatility

Solution Approach 1:

The green zones and control parameters are determined dynamically based on real-time system conditions, generator capabilities, and NERC standards. The system continuously adapts its operational boundaries and control strategies to maintain compliance while maximizing flexibility, allowing operators to respond to changing conditions without violating standards.

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The system changes operational parameters such as acceptable ACE ranges, frequency tolerances, and generator dispatch priorities based on system conditions and compliance requirements. This parameter flexibility allows the system to maintain NERC compliance while adapting to varying operational needs and maintaining versatility in response to different scenarios.

Inventive Principle:
Principle #35Parameter changes

Data Source

PatentEP3367534B1Systems, apparatus, and methods for automatic generation control enhanced with advanced reliability based control
Publication Date: 2021.12.01 SIEMENS INDUSTRY INC
  • EP3367534B1 patent drawingFigure 1
  • EP3367534B1 patent drawingFigure 2
  • EP3367534B1 patent drawingFigure 3

AI summary

Embodiments provide systems, apparatus, and methods for power distribution operated under automatic generation control (AGC) based on reliability based control (RBC) green zone control. Embodiments include a plurality of power generating resources (108) operating within a control area; a plurality of power consuming loads (112); a power transmission network (114) coupling the resources (108) to the loads (112); and an energy management system (EMS) in communication with the resources (108) and configured to control operation of the resources (108) within the control area, wherein the EMS is operative to: determine a reliability based control (RBC) green zone; operate an automatic generation control (AGC) system of the EMS within the determined RBC green zone; and output electricity to the loads (112) from the resources (108) under the control of the AGC of the EMS operating within the RBC green zone to correct area control error (ACE). Numerous additional aspects are disclosed.