Problem

In communication systems, when a fault occurs in the main line between a radio equipment controller (REC) and radio equipment (RE), it disrupts communication, requiring manual onsite processing, increasing maintenance costs and service interruption time, and affecting user experience.

Innovation Solution

The REC determines a standby line for communication, such as a power cable line or a power cable plus CPRI communications line, to maintain connectivity with the RE, allowing automatic switching and reducing the need for manual intervention.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If a main line (CPRI communications line) is used for communication between REC and RE, then communication reliability is improved, but when a fault occurs, manual onsite processing is required which increases maintenance cost and service interruption time

Engineering Contradiction:
Improvecommunication reliabilityVSAvoidmaintenance cost and service interruption time
Core Design Contradiction:
ReliabilityVSEase of repair

Solution Approach 1:

The patent pre-establishes a standby line (power cable) alongside the main CPRI communication line before faults occur. This standby infrastructure is prepared in advance so that when the main line fails, the system can immediately switch to the pre-configured standby path without requiring manual onsite installation or configuration, thereby reducing maintenance cost and service interruption time while maintaining communication reliability

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent introduces a standby power cable as an intermediary communication path. When the main CPRI line fails, this intermediary power cable serves as a backup communication channel, allowing the REC to communicate with the RE through an alternative route. This mediator approach ensures continuous communication while eliminating the need for manual intervention during fault recovery

Inventive Principle:
Principle #24Intermediary (Mediator)

2Difficulty of detecting and measuring

If manual onsite processing is required when main line fault occurs, then fault location can be identified, but service interruption time increases and user experience deteriorates

Engineering Contradiction:
Improvefault detection capabilityVSAvoidservice interruption time
Core Design Contradiction:
Difficulty of detecting and measuringVSLoss of time

Solution Approach 1:

The patent implements automatic fault detection and automatic switching functionality that enables the communication system to service itself without manual intervention. When a fault is detected on the main line, the system automatically switches to the standby power cable communication path, eliminating the need for manual fault detection and repair operations, thereby reducing service interruption time while maintaining fault detection capability

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The system performs preliminary configuration of the standby power cable communication path during normal operation, so that when a fault occurs, the switch to standby mode can happen immediately without requiring manual fault location or repair actions, thus minimizing service interruption time while preserving fault detection abilities

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS10419081B2Information transmission method, radio equipment controller, radio equipment, and base station
Publication Date: 2019.09.17 HUAWEI TECH CO LTD
  • US10419081B2 patent drawing
  • US10419081B2 patent drawing
  • US10419081B2 patent drawing

AI summary

Embodiments of the present invention provide an information transmission method, a radio equipment controller, a radio equipment, and a base station. The method includes determining, by an REC, that a main line used for communication with a first radio equipment RE is faulty and determining, by the REC, a standby line used for communication with the first RE. The method also includes communicating with the first RE by using the standby line.