Recovery Work Prioritization Using Equipment Operating Rate Thresholds
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
Existing work management support devices struggle to set appropriate work priorities, leading to potential inefficiencies and decreased productivity.
Innovation Solution
An information processing method and device that obtain priority data for equipment recovery work, estimate equipment operating rates, select priority data based on threshold values, and output the selected data to support improved productivity.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Productivity
If work priorities are set based on simple work management support devices, then work assignments can be made to workers, but appropriate work priorities cannot be set leading to decreased productivity
Solution Approach 1:
The system estimates equipment operating rates for workers' overseen equipment and uses this feedback information to select appropriate priority data. The estimated operating rates are compared against threshold values to determine which recovery work should be prioritized, creating a closed-loop feedback mechanism that continuously optimizes work assignments based on actual equipment performance data.
Solution Approach 2:
The patent replaces manual or simple automated priority setting mechanisms with an intelligent system that automatically estimates equipment operating rates and selects priorities based on these estimates. This substitution of mechanical/simplified systems with intelligent estimation and automated selection processes enables appropriate priority setting that directly improves productivity.
2Measurement precision
If equipment operating rate estimation is performed for all priority data items, then suitable priority data can be selected, but system complexity increases
Solution Approach 1:
The system changes the parameter of priority selection from static predefined priorities to dynamic priorities based on estimated equipment operating rates. By introducing the operating rate parameter and comparing it against threshold values, the system achieves precise priority data selection that adapts to current equipment conditions without requiring overly complex systems.
Data Source
AI summary
The information processing method includes: obtaining items of priority data each representing a priority for a combination of a unit of equipment among units of equipment and a stoppage factor, the priority being for recovery work for equipment that has stopped among the units of equipment; estimating, for each item of the priority data, an equipment operating rate of overseen equipment among the units of equipment, the overseen equipment being equipment that a worker who performs the recovery work is in charge of; selecting, from among the items of priority data, priority data for which the equipment operating rate is greater than or equal to a threshold value; and outputting the selected priority data.