Problem

Homeowners face significant effort in identifying and contacting contractors, arranging home visits, and synthesizing bids for remodeling projects, making the conventional cost estimation process inefficient.

Innovation Solution

A software and hardware facility that uses visual analysis of remodeling project photos to discern characteristics, trains a model to predict costs based on geographic location, and estimates project costs with reduced homeowner effort by uploading photos and specifying locations, incorporating attribute imputation and multiple contractor bids.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If conventional contractor consultation method is used, then cost estimation accuracy is improved, but homeowner effort and time consumption increase significantly

Engineering Contradiction:
Improvecost estimation accuracyVSAvoidhomeowner effort and time consumption
Core Design Contradiction:
Measurement precisionVSLoss of time

Solution Approach 1:

The system enables automated cost estimation that serves itself by analyzing photos and generating estimates without requiring homeowner intervention in contractor coordination. The automated visual analysis and model-based estimation replace manual contractor consultations, reducing homeowner effort while maintaining estimation accuracy.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The patent replaces the mechanical process of manual contractor consultations with an automated computational system. Visual analysis algorithms and prediction models substitute for human contractor assessments, eliminating the need for homeowners to physically coordinate multiple site visits while preserving cost estimation accuracy.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

2Reliability

If multiple contractor bids are collected, then estimation reliability is improved, but process complexity and coordination effort increase

Engineering Contradiction:
Improveestimation reliabilityVSAvoidprocess complexity and coordination effort
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The system merges multiple contractor bid data into a unified estimation model. By combining historical bid information from multiple contractors with visual analysis results, the system generates reliable cost estimates without requiring homeowners to individually coordinate each contractor, thus maintaining reliability while reducing coordination complexity.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The estimation system serves multiple functions: it analyzes visual project characteristics, processes historical contractor bid data, adjusts for geographic and temporal factors, and generates consolidated cost estimates. This multi-functional approach consolidates what would otherwise require separate coordination processes into a single automated system.

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Productivity

If automated visual analysis is used, then process efficiency is improved, but measurement precision of project characteristics may deteriorate

Engineering Contradiction:
Improveprocess efficiencyVSAvoidproject characteristics accuracy
Core Design Contradiction:
ProductivityVSMeasurement precision

Solution Approach 1:

The system incorporates feedback mechanisms where estimation results and project characteristics are continuously refined based on historical data and model performance. The automated visual analysis is improved through feedback from actual project outcomes and contractor bids, maintaining measurement precision while preserving processing efficiency.

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The system performs preliminary visual analysis of project photos to extract characteristics before generating cost estimates. This preliminary extraction of project attributes (room type, size, features) enables efficient processing while maintaining accuracy by preparing structured data that feeds into the estimation model with sufficient detail.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS11494794B1Estimating the cost of residential remodeling projects
Publication Date: 2022.11.08 MFTB HOLDCO INC
  • US11494794B1 patent drawing
  • US11494794B1 patent drawing
  • US11494794B1 patent drawing

AI summary

A facility for estimating the cost of a remodeling project is described. The facility accesses a project cost model that predicts project costs determined from a photograph based upon project characteristics. The facility applies the access project cost model to characteristics of a distinguished project to obtain an estimated cost. The facility causes the obtained estimated cost to be displayed.