Problem

Existing installation boxes for electric wirings in concrete ceilings, such as those described in European patent EP 1 986 299, are not easily replaceable or modifiable, leading to inefficiencies in installation and waste generation.

Innovation Solution

An installation box assembly comprising an installation box and a complementary installation sleeve that can be connected in a releasable manner, allowing pre-installation of electric materials at a remote location and easy replacement on-site, with features like snap connections and blocking mechanisms to secure the box in place.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If the installation box is fixed in the hollow core slab, then the installation is stable and secure, but the installation box cannot be replaced or modified

Engineering Contradiction:
Improveinstallation stabilityVSAvoidreplaceability
Core Design Contradiction:
ReliabilityVSAdaptability or versatility

Solution Approach 1:

The installation system is divided into two separate components: the installation sleeve that remains fixed in the hollow core slab, and the installation box that can be removed and replaced. This segmentation allows the sleeve to provide stable anchoring while the box can be exchanged as needed, resolving the contradiction between stability and replaceability.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The installation sleeve acts as an intermediary component between the hollow core slab and the installation box. It provides a stable interface with the slab while allowing the box to be inserted, secured, and removed, thereby enabling both stable installation and future replaceability.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Reliability

If electric installation material is installed on-site, then the installation box is ready for use, but the installation time on-site is increased

Engineering Contradiction:
Improveinstallation readinessVSAvoidon-site installation time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

Electric installation material can be pre-installed in the installation box at a remote location or off-site before the box is transported to the building site. This preliminary action ensures the box is ready for immediate use upon installation, while minimizing the time electricians need to spend on-site for material installation.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The installation process is segmented into separate phases: off-site preparation of the installation box with electric materials, and on-site installation of only the box itself into the sleeve. This separation allows complex material installation to be done elsewhere, reducing on-site time while ensuring installation readiness.

Inventive Principle:
Principle #1Segmentation

3Reliability

If the installation box is permanently installed in the hollow core slab, then the installation is secure, but the hollow core slab cannot be reused

Engineering Contradiction:
Improveinstallation securityVSAvoidwaste generation
Core Design Contradiction:
ReliabilityVSLoss of substance

Solution Approach 1:

The system separates the permanent component (installation sleeve in the hollow core slab) from the removable component (installation box). The sleeve remains as a permanent fixture providing secure installation, while the box can be removed and the hollow core slab reused, thereby reducing waste without compromising installation security.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The installation box can be removed and discarded or reused, while the hollow core slab with the installed sleeve is recovered and reused. This approach minimizes waste generation by enabling the recovery and reuse of the expensive hollow core slab, while maintaining secure installation through the permanent sleeve.

Inventive Principle:
Principle #34Discarding and recovering

Data Source

PatentEP4604338A1Installation box assembly for electric wirings
Publication Date: 2025.08.20 ABB (SCHWEIZ) AG
  • EP4604338A1 patent drawingFigure 1
  • EP4604338A1 patent drawingFigure 2
  • EP4604338A1 patent drawingFigure 3

AI summary

The invention relates to an installation box assembly configured for being installed in a floor and/or ceiling, in particular a hollow core slab, the installation box assembly comprising an installation box having an installation portion defined by a circumferential wall, wherein the circumferential wall defines an installation space therein for receiving electric installation material, and has an opening on at least one end thereof for providing access to installation space, wherein the installation box assembly further comprises an installation sleeve configured to be placed about the installation box, and having a sleeve wall of which the inner circumference is complementary to the outer circumference of the circumferential wall, and wherein the installation box and the installation sleeve are connected to each other in a releasable manner.