Resource Assignment Based on Device Capability Analysis

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing resource management systems fail to accurately predict the availability of resources and capabilities on user devices, leading to potential delays in completing assigned activities due to the lack of consideration for contextual factors such as user behavior, device associations, and location-specific information.

Innovation Solution

A method and system that analyzes the resources and capabilities of user devices, predicts the required resources and capabilities needed for an assigned activity, and recommends alternative assignees if the initial device is unable to complete the task within the allocated timeframe, utilizing natural language processing and contextual analysis to assess the availability of resources and capabilities.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If resource management systems assign activities without analyzing contextual factors, then assignment speed is improved, but completion reliability deteriorates

Engineering Contradiction:
Improveassignment speedVSAvoidactivity completion reliability
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The system performs preliminary analysis of user context, device resources, and activity requirements before making assignments. By proactively gathering and evaluating contextual information about user availability, device capabilities, and task demands, the system ensures reliable assignments are made only after confirming compatibility, thus maintaining both speed and reliability.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system continuously monitors and updates information about user context, device resource availability, and activity completion status. This feedback loop enables the system to adjust assignments dynamically based on current conditions, ensuring that assignments remain reliable even as contextual factors change over time.

Inventive Principle:
Principle #23Feedback

2Measurement precision

If the system analyzes resources and capabilities of multiple devices and assignees, then assignment accuracy is improved, but system complexity increases

Engineering Contradiction:
Improveassignment accuracyVSAvoidsystem complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The system divides the complex analysis task into separate modules: one for analyzing user context and availability, another for assessing device resources and capabilities, and a third for evaluating activity requirements. Each module independently processes its specific aspect and contributes to the final assignment decision, making the overall system more manageable and maintainable while achieving high accuracy.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system develops a universal analysis framework that can evaluate multiple assignees and their devices using the same set of criteria and metrics. This multi-functional approach allows the system to assess different combinations of users and devices systematically, improving assignment accuracy without proportionally increasing complexity through standardized evaluation procedures.

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Productivity

If the system predicts resources and capabilities required for activities, then resource allocation efficiency is improved, but prediction accuracy requirements increase

Engineering Contradiction:
Improveresource allocation efficiencyVSAvoidprediction accuracy requirement
Core Design Contradiction:
ProductivityVSMeasurement precision

Solution Approach 1:

The system performs preliminary prediction of resource and capability requirements based on historical data and activity characteristics before actual assignment. By anticipating resource needs in advance and preparing appropriate allocations, the system improves resource allocation efficiency while managing prediction accuracy requirements through proactive planning and contingency considerations.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS11687370B2Activity assignment based on resource and service availability
Publication Date: 2023.06.27 INTERNATIONAL BUSINESS MACHINE CORPORATION
  • US11687370B2 patent drawing
  • US11687370B2 patent drawing
  • US11687370B2 patent drawing

AI summary

An embodiment for resource management is provided. The embodiment may include receiving created text of an assigned activity to a proposed assignee. The embodiment may also include identifying information about the assigned activity. The embodiment may further include predicting resources and capabilities required to complete the assigned activity. The embodiment may also include identifying the proposed assignee. The embodiment may further include analyzing the resources and capabilities available on one or more devices of the proposed assignee. The embodiment may also include in response to determining the proposed assignee is able to complete the assigned activity, displaying to an assignor a predicted start time and time of completion of the assigned activity and in response to determining the proposed assignee is unable to complete the assigned activity, recommending to the assignor another assignee that is able to complete the assigned activity.