Resource Element Muting in Coordinated Multi-Point Processing

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In wireless communication networks, particularly in LTE-A Downlink Coordinated Multi-point Processing (CoMP), the lack of awareness by user equipment (UE) about all transmission points involved in joint transmissions can lead to decoding errors due to incorrect treatment of resource elements designated for cell-specific reference signals, resulting in data loss and excessive downlink control information overhead.

Innovation Solution

Implementing Resource Element (RE) muting by designating a lead base station to map data to all available resource blocks except those reserved for cell-specific reference signals, and instructing other base stations to mute transmissions in these reserved resource elements, thereby avoiding decoding errors and minimizing control overhead.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Device complexity

If user equipment does not have awareness of all transmission points involved in joint transmissions, then device complexity is reduced, but decoding errors occur due to incorrect treatment of resource elements

Engineering Contradiction:
Improveuser equipment complexityVSAvoiddecoding accuracy
Core Design Contradiction:
Device complexityVSReliability

Solution Approach 1:

The patent extracts and removes the problematic transmissions from resource elements designated for cell-specific reference signals by implementing RE muting. The lead base station identifies which resource elements contain CRS and instructs other base stations to mute their transmissions in those specific resource elements, thereby eliminating the source of decoding errors while keeping the UE design simple.

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The patent applies preliminary action by having the lead base station determine and communicate the muting pattern to other base stations before the actual coordinated transmission occurs. This advance preparation ensures that all base stations are synchronized and will mute their transmissions in the correct resource elements, preventing decoding errors before they can occur.

Inventive Principle:
Principle #10Preliminary action

2Productivity

If data is mapped to all available resource elements without muting, then resource utilization is maximized, but decoding errors and data loss occur

Engineering Contradiction:
Improveresource utilizationVSAvoiddata integrity
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The patent applies local quality by differentiating the treatment of different resource elements. Instead of uniformly muting all resource elements or using a single mapping strategy, the system identifies specific resource elements designated for CRS and applies muting only to those localized regions. This allows data to be mapped to all non-CRS resource elements, maximizing resource utilization while maintaining data integrity in critical reference signal regions.

Inventive Principle:
Principle #3Local quality

3Reliability

If control information is increased to inform UEs about all transmission points, then decoding accuracy improves, but control overhead increases excessively

Engineering Contradiction:
Improvedecoding accuracyVSAvoidcontrol information overhead
Core Design Contradiction:
ReliabilityVSLoss of information

Solution Approach 1:

The patent extracts the need for extensive control information by removing the source of the problem through RE muting. Instead of informing UEs about all transmission points and their respective CRS locations (which would require excessive control overhead), the system proactively mutes transmissions in CRS resource elements, eliminating the need for such detailed control information while maintaining decoding accuracy.

Inventive Principle:
Principle #2Taking out (Extraction)

4Power

If multiple base stations transmit simultaneously in all resource elements, then transmission power is maximized, but interference and decoding errors increase

Engineering Contradiction:
Improvetransmission powerVSAvoidtransmission quality
Core Design Contradiction:
PowerVSReliability

Solution Approach 1:

The patent applies local quality by enabling full-power transmission in most resource elements while applying localized muting only in specific resource elements designated for CRS. This allows the system to maximize transmission power and maintain high transmission quality in data-bearing resource elements while preventing interference and decoding errors in the critical reference signal regions.

Inventive Principle:
Principle #3Local quality

Data Source

PatentUS9313783B2Enhancing coordinated multi-point processing transmission through resource element muting
Publication Date: 2016.04.12 FCNT LLC
  • US9313783B2 patent drawing
  • US9313783B2 patent drawing
  • US9313783B2 patent drawing

AI summary

A system and method of signal transmission in a wireless communications network is disclosed. A coordinated transmission is transmitted from a plurality of base stations, each including a transmission point. Each transmission point is configured to transmit a cell specific reference signal in a particular set of resource elements. Additionally, a determination is made regarding which of the plurality of base stations will serve as a lead base station in the coordinated transmission and data is mapped to all available resource elements in a physical resource block, except the resource elements in which the lead base station is configured to transmit a cell-specific reference signal. Further, each remaining base station is instructed to mute transmissions in the particular set of resource elements in which the corresponding transmission point is configured to transmit a cell specific reference signal.