Road Drain Positioning Markings for Accurate Curb Alignment

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The challenge in installing street drains is aligning the position with the curb, especially when the curb has not yet been laid or is removed during installation, leading to delays and significant effort due to the weight of the drain components.

Innovation Solution

A street drain kit and method that includes markings on the lower components to align with the planned curb course, using temporary aids like strings or laser lines, ensuring precise positioning before the curb is laid, and utilizing templates with guide edges and contact surfaces to facilitate correct alignment.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If the drain is installed before the curb is laid, then the drain can be positioned early in the construction process, but alignment with the curb becomes difficult and requires significant correction effort

Engineering Contradiction:
Improveconstruction progressVSAvoidalignment precision
Core Design Contradiction:
ProductivityVSManufacturing precision

Solution Approach 1:

The patent applies preliminary action by providing alignment markings directly on the drain components before installation. These markings indicate the correct position relative to the curb, allowing workers to align the drain accurately even before the curb is laid. This preliminary preparation of alignment information eliminates the need for costly and time-consuming corrections later in the construction process.

Inventive Principle:
Principle #10Preliminary action

2Stability of the object's composition

If the drain components are heavy, then they are stable during installation, but correcting position errors becomes labor-intensive and time-consuming

Engineering Contradiction:
Improveinstallation stabilityVSAvoidcorrection time
Core Design Contradiction:
Stability of the object's compositionVSLoss of time

Solution Approach 1:

The alignment markings on the drain components enable workers to achieve correct positioning during the initial installation, preventing the need for time-consuming corrections. The markings serve as a guide that allows accurate placement even when handling heavy components, thereby minimizing the time lost to repositioning operations.

Inventive Principle:
Principle #10Preliminary action

3Ease of manufacture

If the curb is removed during drain installation, then the drain can be installed independently, but subsequent curb laying requires dismantling and repositioning of the drain

Engineering Contradiction:
Improveinstallation independenceVSAvoidreinstallation complexity
Core Design Contradiction:
Ease of manufactureVSDevice complexity

Solution Approach 1:

The alignment markings are provided on the drain components before installation, enabling workers to position the drain correctly even when the curb is not yet in place or has been removed. This preliminary alignment guidance ensures that when the curb is later installed, no dismantling or repositioning of the drain is necessary, thereby simplifying the overall construction process.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentEP4283058B1Gully with positioning aid
Publication Date: 2026.02.25 FUNKE KUNSTSTOFFE GMBH
  • EP4283058B1 patent drawingFigure 1
  • EP4283058B1 patent drawingFigure 2~3
  • EP4283058B1 patent drawingFigure 4~5

AI summary

In the case of a road drain (1) with an inlet opening (7) and with further components arranged below the inlet opening (7), wherein the road drain (1) is intended to abut a curb (2) in a vertically extending connection plane (3), it is proposed that one of the lower components of the road drain (1) has a marking (4) which is arranged substantially in the connection plane (3). Furthermore, a kit for a road drain (1) is proposed, as well as a method for constructing a road drain (1).