Road Surface State Estimation Excluding Recent Construction

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current road maintenance techniques are inefficient in estimating and managing road surface states across multiple sections, leading to excessive calculation loads on management systems and potential delays in identifying areas that require repair.

Innovation Solution

An information processing device and method that estimate road surface states by excluding road sections where recent construction has been performed, using vehicle-acquired data to reduce the number of sections requiring analysis and thereby lowering the calculation load on management servers.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If road surface state estimation is performed for all road sections, then measurement precision is improved, but calculation load increases

Engineering Contradiction:
Improveroad surface state estimation accuracyVSAvoidcalculation load
Core Design Contradiction:
Measurement precisionVSPower

Solution Approach 1:

The patent extracts newly constructed road sections from the overall road network and excludes them from estimation processing. By identifying road sections with construction timestamps within a predetermined period and removing them from the analysis set, the system reduces calculation load while maintaining estimation accuracy for roads that actually require assessment.

Inventive Principle:
Principle #2Taking out (Extraction)

2Reliability

If road surface state estimation is performed for all road sections, then reliability of maintenance decisions is improved, but loss of time increases

Engineering Contradiction:
Improvemaintenance decision reliabilityVSAvoidprocessing time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The system extracts and excludes newly constructed road sections from the estimation processing queue. By removing these sections that don't require immediate assessment, the processing time is reduced while the reliability of maintenance decisions for remaining roads is preserved through continued accurate estimation.

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The system performs preliminary identification of newly constructed road sections using construction timestamp data before the main estimation process. This preliminary action filters out sections that should be excluded, allowing the subsequent estimation process to focus only on relevant roads and thereby reducing overall processing time without compromising decision reliability.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS20230383485A1Information processing device, information processing method, and storage medium
Publication Date: 2023.11.30 TOYOTA JIDOSHA KK
  • US20230383485A1 patent drawing
  • US20230383485A1 patent drawing
  • US20230383485A1 patent drawing

AI summary

In an information processing device according to the present disclosure, a control unit collects vehicle information including a wheel speed change rate acquired by a vehicle traveling on each of a plurality of road sections. The control unit executes a first process of estimating a road surface state of each road section based on the collected vehicle information. At this time, the control unit executes the first process by excluding, from among the road sections, a first road section where first construction related to repair of a road surface has been performed.