Problem
Existing methods for producing supporting structures, such as those using welding, rivets, or screws, are inefficient and result in high production costs due to the need for extensive on-site assembly and handling of nuts.
Innovation Solution
A connecting element with pre-arranged nuts on a base element, allowing for automated assembly in a workshop and eliminating the need for on-site nut handling, thereby simplifying the production process and reducing costs.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Productivity
If nuts are arranged manually on connecting elements during on-site assembly, then the supporting structure can be assembled, but the production time and costs increase significantly
Solution Approach 1:
The patent applies preliminary action by pre-arranging nuts on the connecting elements during manufacturing in the workshop, before the supporting structure is assembled on-site. This transfers the nut arrangement operation from the construction phase to the manufacturing phase, where it can be performed more efficiently and eliminates the time-consuming manual nut handling during on-site assembly.
2Strength
If traditional welding or riveting methods are used to connect bars, then structural strength is achieved, but the production process becomes complex and time-consuming
Solution Approach 1:
The patent applies segmentation by dividing the connecting element into a base element and separately attachable nuts. This segmentation allows the nuts to be pre-positioned on the base element during manufacturing, creating a pre-assembled unit that simplifies on-site installation while maintaining strong screw connections between the bars and the connecting element.
3Ease of operation
If manual handling and arrangement of nuts is performed on-site, then the connecting element can be assembled, but labor costs and production expenses increase
Solution Approach 1:
The patent applies preliminary action by pre-arranging nuts on the connecting elements during manufacturing in the workshop, before the supporting structure is assembled on-site. This transfers the nut arrangement operation from the construction phase to the manufacturing phase, where it can be performed more efficiently and eliminates the time-consuming manual nut handling during on-site assembly.
Data Source
AI summary
A connecting element for a supporting structure via which at least two rods of a supporting structure can be releasably connected to the connecting element by screw connections. In order to achieve particularly efficient production, the connecting element has a base element with bores, wherein nuts are provided on the bores. A method for producing a supporting structure, which comprises at least three bars that are connected at a junction point via a connecting element by screw connections, is also provided.