Problem

Existing methods for producing supporting structures, such as those using welding, rivets, or screws, are inefficient and result in high production costs due to the need for extensive on-site assembly and handling of nuts.

Innovation Solution

A connecting element with pre-arranged nuts on a base element, allowing for automated assembly in a workshop and eliminating the need for on-site nut handling, thereby simplifying the production process and reducing costs.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If nuts are arranged manually on connecting elements during on-site assembly, then the supporting structure can be assembled, but the production time and costs increase significantly

Engineering Contradiction:
Improveproduction efficiencyVSAvoidon-site assembly time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The patent applies preliminary action by pre-arranging nuts on the connecting elements during manufacturing in the workshop, before the supporting structure is assembled on-site. This transfers the nut arrangement operation from the construction phase to the manufacturing phase, where it can be performed more efficiently and eliminates the time-consuming manual nut handling during on-site assembly.

Inventive Principle:
Principle #10Preliminary action

2Strength

If traditional welding or riveting methods are used to connect bars, then structural strength is achieved, but the production process becomes complex and time-consuming

Engineering Contradiction:
Improveconnection strengthVSAvoidassembly process complexity
Core Design Contradiction:
StrengthVSDevice complexity

Solution Approach 1:

The patent applies segmentation by dividing the connecting element into a base element and separately attachable nuts. This segmentation allows the nuts to be pre-positioned on the base element during manufacturing, creating a pre-assembled unit that simplifies on-site installation while maintaining strong screw connections between the bars and the connecting element.

Inventive Principle:
Principle #1Segmentation

3Ease of operation

If manual handling and arrangement of nuts is performed on-site, then the connecting element can be assembled, but labor costs and production expenses increase

Engineering Contradiction:
Improveon-site assembly easeVSAvoidproduction cost
Core Design Contradiction:
Ease of operationVSEase of manufacture

Solution Approach 1:

The patent applies preliminary action by pre-arranging nuts on the connecting elements during manufacturing in the workshop, before the supporting structure is assembled on-site. This transfers the nut arrangement operation from the construction phase to the manufacturing phase, where it can be performed more efficiently and eliminates the time-consuming manual nut handling during on-site assembly.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS20250052273A1Connecting element for a supporting structure and method for producing the same
Publication Date: 2025.02.13 BOUAOUAJA KAMAL
  • US20250052273A1 patent drawing
  • US20250052273A1 patent drawing
  • US20250052273A1 patent drawing

AI summary

A connecting element for a supporting structure via which at least two rods of a supporting structure can be releasably connected to the connecting element by screw connections. In order to achieve particularly efficient production, the connecting element has a base element with bores, wherein nuts are provided on the bores. A method for producing a supporting structure, which comprises at least three bars that are connected at a junction point via a connecting element by screw connections, is also provided.