Rolling Leveler for Stone Paver Sand Bed

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing mold systems for stone pavers lack an efficient mechanism to level and adjust the sand bed, leading to uneven surfaces and difficulties in achieving precise sand distribution.

Innovation Solution

A rolling leveler system comprising a screed structure and adjustable rail tracks that elevate and level the sand bed, allowing the screed to straddle and smooth the sand within the mold, ensuring even distribution and adjustable elevation.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Manufacturing precision

If a traditional mold system without adjustable leveling mechanism is used, then the device complexity is reduced, but the manufacturing precision of the sand bed surface deteriorates

Engineering Contradiction:
Improvesand bed surface leveling precisionVSAvoidmold system structure complexity
Core Design Contradiction:
Manufacturing precisionVSDevice complexity

Solution Approach 1:

The patent implements adjustable rail tracks that can be positioned at different elevations and orientations, transforming a static mold system into a dynamic one. The rails can be adjusted to various positions using bolts and slots, allowing the screed to adapt to different sand bed conditions and achieve precise leveling while maintaining manageable system complexity through modular adjustment mechanisms

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The leveling system is divided into separate functional components: adjustable rail tracks, a screed structure with leveling blades, and independent adjustment mechanisms. This segmentation allows each component to be optimized independently and facilitates easy adjustment and maintenance, resolving the contradiction between precision and complexity

Inventive Principle:
Principle #1Segmentation

2Manufacturing precision

If sand is poured directly into the mold without a leveling mechanism, then the ease of operation is improved, but the manufacturing precision of sand distribution deteriorates

Engineering Contradiction:
Improvesand distribution uniformityVSAvoidsand bed preparation complexity
Core Design Contradiction:
Manufacturing precisionVSEase of operation

Solution Approach 1:

The screed structure automatically levels the sand bed as it is pulled across the mold. The adjustable leveling blades contact the sand and automatically find the correct position through gravity and sand resistance, eliminating the need for manual sand spreading and leveling operations. This self-leveling capability achieves precise sand distribution while maintaining operational simplicity

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The screed acts as an intermediary tool between the poured sand and the final leveled sand bed. It mediates the transformation from uneven poured sand to uniformly leveled sand surface through its adjustable blades that glide over and level the sand, simplifying the operator's task while ensuring precise sand distribution

Inventive Principle:
Principle #24Intermediary (Mediator)

3Reliability

If the screed structure is placed directly on the sand, then the ease of operation is improved, but the reliability of consistent sand bed elevation deteriorates

Engineering Contradiction:
Improvesand bed elevation consistencyVSAvoidscreed positioning complexity
Core Design Contradiction:
ReliabilityVSEase of operation

Solution Approach 1:

The rail tracks serve as an intermediary support structure between the screed and the sand bed. They provide a stable, adjustable framework that elevates the screed above direct contact with sand while allowing precise positioning. The rails ensure consistent sand bed elevation by providing fixed reference points for the screed's leveling blades, maintaining reliability without complicating operation

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The rail tracks are designed with adjustable elevation and orientation capabilities, allowing the system to adapt to different mold configurations and sand bed requirements. This dynamic adjustability ensures consistent sand bed elevation across various operating conditions while maintaining ease of setup through straightforward mechanical adjustment mechanisms

Inventive Principle:
Principle #15Dynamics

Data Source

PatentUS20240271373A1Rolling leverer for sand bed for stone pavers
Publication Date: 2024.08.15 SHEEHAN FINBARR
  • US20240271373A1 patent drawing
  • US20240271373A1 patent drawing
  • US20240271373A1 patent drawing

AI summary

The rolling leveler for sand bed for stone pavers is configured for use with sand. The rolling leveler for sand bed for stone pavers levels sand after the sand has been placed into a sand mold structure. The rolling leveler for sand bed for stone pavers comprises a screed structure and a rail structure. The screed structure rolls along rail structure. The rail structure elevates the screed structure above the sand contained in the sand mold structure. The elevation of the screed structure above the sand mold structure is adjustable. The screed structure rolls along the rail structure to level the sand contained in the sand mold structure.