Sample Analyzer Consumable Manager for Flexible Replacement Timing
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
Existing methods for replenishing consumables in sample analyzers are inflexible and do not account for varying user requirements regarding replacement timing, leading to potential interruptions in sample analysis due to insufficient consumables.
Innovation Solution
A sample analysis system with a consumable manager that includes a controller, storage, and interface to manage consumable replacement timing, allowing users to input desired periods of time and receive predicted replacement timings based on usage records, catering to individual user needs.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Adaptability or versatility
If a fixed replenishment schedule (day or next day) is used, then the system can provide basic consumable management, but it cannot flexibly meet different user requirements for various time periods
Solution Approach 1:
The system dynamically adapts to different user requirements by allowing flexible selection of time periods (shorter than a day, a day, or longer than a day) rather than using a fixed replenishment schedule. The consumable manager adjusts its predictions based on the selected time period, making the system adaptable to various user scenarios without requiring multiple separate systems.
2Loss of information
If the system provides detailed predicted replacement timing, then users can plan consumable replacements, but users must input and process multiple time period options
Solution Approach 1:
The consumable manager provides feedback to users about predicted replacement timings based on usage records. The system presents multiple time period options (shorter than a day, a day, or longer than a day) and provides corresponding predicted replacement timing information for each, allowing users to select the most appropriate timeframe for their needs while receiving comprehensive replacement timing data.
Data Source
Figure 1
Figure 2
Figure 3
AI summary
Disclosed is a sample analysis system (1) comprising a plurality of sample analyzers (3,4,5) configured to analyze samples by using consumables (201-205, 211-216), and a consumable manager (2) configured to manage a replacement timing of the consumables in each of the sample analyzers (3,4,5), wherein the consumable manager (2) comprises a controller (301), a storage (310), and an interface (302, 303) for an input and an output of information, wherein the controller (301) is configured to obtain a usage record of the consumables from each of the sample analyzers (3,4,5) and store the usage record in the storage (310), receive, via the interface (302, 303), an input specifying a desired period among multiple periods of different lengths of time including (i) a period longer than a day and (ii) a period of a day or shorter, and provide, via the interface (302, 303), information regarding a predicted replacement timing of the consumables during the desired period based on the usage record.