Scaffold Attachment Work Surface for Faster Insulation Adhesive Application

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Applying adhesive to insulation boards on scaffolding is cumbersome and time-consuming due to the limited space on scaffolding, making it difficult to handle and attach insulation boards efficiently.

Innovation Solution

An attachment device with suspension elements and a work surface that can be positioned on scaffolding, allowing for easy application of adhesive to insulation boards and supporting other construction elements, featuring a fastening mechanism for secure attachment and a work surface that can be rotated and adjusted to accommodate different sizes.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If insulation boards are handled and adhesive is applied on scaffolding, then the insulation work can be performed, but the limited space on scaffolding makes the work cumbersome and time-consuming

Engineering Contradiction:
Improvework speedVSAvoidhandling ease
Core Design Contradiction:
ProductivityVSEase of operation

Solution Approach 1:

The patent extends the work surface from the limited two-dimensional scaffolding platform into the three-dimensional space above it by suspending an oversized work surface from the scaffolding structure. This allows insulation boards to be positioned and prepared in mid-air, effectively utilizing vertical space to overcome horizontal space constraints.

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

Solution Approach 2:

The suspended work surface acts as an intermediary between the scaffolding structure and the insulation boards. It provides a stable, extended platform that mediates the interaction between workers and insulation materials, enabling efficient handling and adhesive application without direct manipulation on the crowded scaffolding platform.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Productivity

If a work surface is added to the attachment device, then adhesive application becomes easier and faster, but the device complexity increases

Engineering Contradiction:
Improveadhesive application speedVSAvoidstructure complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The suspended work surface is designed as a multi-functional platform that not only supports insulation boards for adhesive application but can also accommodate tools, materials, and potentially serve as a mounting surface for electronic devices. This universality justifies the added structural complexity by providing multiple benefits from a single addition.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The work surface is suspended rather than fixed rigidly, allowing it to be dynamically positioned and adjusted. The suspension system enables the work surface to be moved into place, positioned at appropriate heights, and removed when needed, providing flexibility that offsets the complexity of the attachment mechanism.

Inventive Principle:
Principle #15Dynamics

Data Source

PatentEP4603661A1Attachment device for a scaffolding
Publication Date: 2025.08.20 GALA EUGEN
  • EP4603661A1 patent drawingFigure 1~4
  • EP4603661A1 patent drawingFigure 5~6
  • EP4603661A1 patent drawingFigure 7

AI summary

The invention relates to an attachment device (11) for a scaffold (12) which can be quickly and easily attached to a scaffold (12) (see Figure 1).