Schedule Display for Aligning Battery Charging With Demand Response

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing energy management systems, such as those described in WO 2020/100288, do not adequately provide a user interface for administrators of power storage devices to select and participate in demand response (DR) programs, particularly in matching charging or discharging schedules with DR timing, which can lead to inefficiencies in power usage and participation in economic DR opportunities.

Innovation Solution

A display device that acquires and simultaneously displays scheduling information for power storage device operations and DR requests, allowing users to easily identify and adjust charging or discharging schedules to align with DR timings, including distinguishing between different types of DR and supply-and-demand conditions, enabling users to participate in desired DR programs.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If timer charging is used to charge at predetermined time zones, then charging schedule is fixed and simple to manage, but it cannot adapt to irregular DR timing and miss economic DR opportunities

Engineering Contradiction:
Improveadaptability to DR timingVSAvoidschedule management complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The charging schedule is made dynamic by allowing users to adjust and modify charge/discharge timing based on DR requests. The system transitions from fixed timer charging to flexible scheduling where users can shift charging operations to align with DR time zones while maintaining overall schedule manageability through the display interface.

Inventive Principle:
Principle #15Dynamics

2Productivity

If automatic charging plan generation is implemented, then charging efficiency is improved, but user control and interface for selecting DR programs are insufficient

Engineering Contradiction:
Improvecharging efficiencyVSAvoiduser control capability
Core Design Contradiction:
ProductivityVSEase of operation

Solution Approach 1:

The system provides visual feedback through the display interface showing DR requests, charge/discharge schedules, and timing alignments. Users can see how their charging plans interact with DR opportunities and make informed adjustments. This feedback loop maintains user control while preserving the efficiency benefits of automated plan generation.

Inventive Principle:
Principle #23Feedback

3Ease of operation

If DR participation is automated without user interface, then system operation is simplified, but user awareness and selection of desired DR programs are reduced

Engineering Contradiction:
Improvesystem operation simplicityVSAvoiduser awareness of DR
Core Design Contradiction:
Ease of operationVSLoss of information

Solution Approach 1:

The display interface acts as an intermediary between the automated DR participation system and the user. It translates complex DR requests and scheduling information into visually accessible formats, enabling users to understand and monitor DR participation without adding operational complexity to the system.

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentUS20230398890A1Display device, energy management system, and schedule display method
Publication Date: 2023.12.14 TOYOTA JIDOSHA KK
  • US20230398890A1 patent drawing
  • US20230398890A1 patent drawing
  • US20230398890A1 patent drawing

AI summary

A mobile terminal functioning as a display device includes a first acquisition unit that acquires a first schedule indicating a time period in which charging or discharging of the power storage device is scheduled, a second acquisition unit that acquires a second schedule indicating a time period in which a demand response requesting charging or discharging of the power storage device is scheduled, and a display unit that displays a schedule window. The display unit simultaneously displays the first schedule and the second schedule on the schedule screen in an identifiable manner.