Scheduling Interface for Robotic Garden Tools

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Users face difficulties in monitoring and adjusting scheduled operation times for robotic garden tools, as existing systems lack an efficient user interface for revising and tracking scheduling information.

Innovation Solution

A user interface on an external device displays scheduling details in an organized manner, allowing users to easily revise and adjust scheduled operation times for robotic garden tools, including a scheduling screen with editable time blocks and options for different operations, with the ability to transmit changes to the robotic tool.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If a traditional scheduling interface is used for robotic garden tools, then the system structure remains simple, but user monitoring and adjustment efficiency deteriorates

Engineering Contradiction:
Improveuser monitoring and adjustment efficiencyVSAvoidinterface structure complexity
Core Design Contradiction:
Ease of operationVSDevice complexity

Solution Approach 1:

The scheduling interface is segmented into multiple interactive elements including draggable time blocks, separate operation type selectors, and hierarchical navigation between daily and weekly views. This segmentation allows users to interact with specific portions of the schedule independently, improving monitoring and adjustment efficiency without requiring a complete redesign of the entire system.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The patent introduces an intermediary graphical interface layer between the user and the robotic garden tool's scheduling system. This interface acts as a mediator that translates user drag-and-drop actions and selections into structured scheduling data, which is then transmitted to the robotic tool. The intermediary layer handles the complexity of schedule management while presenting a simplified interaction model to users.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Loss of information

If scheduling information is displayed in detail, then user understanding of operation times improves, but information organization complexity increases

Engineering Contradiction:
Improvescheduling information clarityVSAvoidinformation organization structure
Core Design Contradiction:
Loss of informationVSDevice complexity

Solution Approach 1:

The scheduling information is organized across multiple dimensions including time (daily vs. weekly views), operation types (mowing, edging, blowing), and visual hierarchy (time blocks nested within days). This multi-dimensional organization allows detailed scheduling information to be presented in a structured manner that maintains clarity while comprehensively displaying operation times, types, and durations without overwhelming the user.

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

Solution Approach 2:

The patent implements a copying mechanism where a selected time block from the daily view can be copied and pasted to create additional scheduled operations. This copying feature allows users to efficiently replicate scheduling patterns across different days or times, reducing the need to manually enter identical scheduling information multiple times while maintaining accurate and detailed schedule records.

Inventive Principle:
Principle #26Copying

Data Source

PatentEP4293593A1Display for scheduling operation of a robotic garden tool
Publication Date: 2023.12.20 TECHTRONIC CORDLESS GP
  • EP4293593A1 patent drawingFigure 1A
  • EP4293593A1 patent drawingFigure 1B
  • EP4293593A1 patent drawingFigure 2

AI summary

An external device that may include a display and a device network interface configured to allow the external device to wirelessly communicate with one or more robotic garden tools. The external device may be configured to display a scheduling screen on the display. The scheduling screen may include a first display area including a calendar that includes a plurality of time blocks. Each time block may represent a time period during which a first robotic garden tool is scheduled to operate. The scheduling screen may include a second display area including first scheduling information about a selected time block. The first scheduling information and the selected time block may be editable via user inputs. The user inputs change the scheduling information or the time block, and the external device also correspondingly changes the other of the scheduling information or the time block in response to the user inputs.