Screed Beam Members for Pavement Longitudinal Groove Formation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The existing grooving construction methods for asphalt and concrete pavements are costly and time-consuming, particularly for forming longitudinal grooves, and often require additional steps like cutting and dust disposal, which increase construction costs and duration. Additionally, these methods are not effective in producing satisfactory drainage and durability.

Innovation Solution

A paving construction method using a screed device equipped with longitudinal groove forming instruments, where beam members are pressed into the pavement face during leveling to create longitudinal grooves, enhancing construction efficiency and durability by minimizing aggregate scattering and improving drainage.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Manufacturing precision

If cutting method is used to form longitudinal grooves, then groove formation is achieved, but construction cost and construction period increase

Engineering Contradiction:
Improvegroove formationVSAvoidconstruction period
Core Design Contradiction:
Manufacturing precisionVSProductivity

Solution Approach 1:

The patent combines the groove formation function with the screed device used for leveling the pavement surface. The beam members are integrated into the screed device, allowing grooves to be formed simultaneously with surface leveling in a single operation, eliminating the need for separate cutting steps and reducing construction time

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The groove forming action is performed during the leveling process before the pavement fully sets. The beam members press into the still-pliable pavement surface during screeding, creating grooves in advance of any subsequent cutting or finishing operations

Inventive Principle:
Principle #10Preliminary action

2Manufacturing precision

If cutting method is used to form longitudinal grooves, then groove formation is achieved, but construction cost increases

Engineering Contradiction:
Improvegroove formationVSAvoidconstruction cost
Core Design Contradiction:
Manufacturing precisionVSEase of manufacture

Solution Approach 1:

The patent combines the groove formation function with the screed device used for leveling the pavement surface. The beam members are integrated into the screed device, allowing grooves to be formed simultaneously with surface leveling in a single operation, eliminating the need for separate cutting steps and reducing construction time

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The screed device is given multi-functionality by adding groove forming capability. The same device that levels the pavement surface also creates the longitudinal grooves, eliminating the need for specialized cutting equipment and reducing overall construction costs

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Manufacturing precision

If conventional grooving methods are used, then grooves are formed, but aggregate scattering occurs reducing durability

Engineering Contradiction:
Improvegroove formationVSAvoiddurability
Core Design Contradiction:
Manufacturing precisionVSReliability

Solution Approach 1:

The patent incorporates a vibration mechanism that acts on the beam members during groove formation. This vibration compacts the aggregate along the groove walls and prevents scattering, ensuring that aggregate remains in place and maintains the structural integrity and durability of the pavement

Inventive Principle:
Principle #18Mechanical vibration

4Reliability

If transverse grooving is used, then skid resistance is improved, but longitudinal groove formation capability is lost

Engineering Contradiction:
Improveskid resistanceVSAvoidgroove orientation capability
Core Design Contradiction:
ReliabilityVSAdaptability or versatility

Solution Approach 1:

The patent makes the groove forming system dynamic by allowing the beam members to be positioned and oriented in different directions. The screed device can form grooves in the longitudinal direction while maintaining the ability to adjust for transverse grooving if needed, providing adaptability for different road conditions and requirements

Inventive Principle:
Principle #15Dynamics

Data Source

PatentUS9982402B2Paving construction method, pavement structure, and longitudinal groove forming instrument for pavement
Publication Date: 2018.05.29 GAEART T K
  • US9982402B2 patent drawing
  • US9982402B2 patent drawing
  • US9982402B2 patent drawing

AI summary

A longitudinal groove forming instrument 11 is provided on a base plate bottom face of a screed 7, 8. The longitudinal groove forming instrument 11 comprises a plurality of beam members 12. The beam members 12 are disposed in parallel with the direction of travel of the screed as the axial direction. A longitudinal groove 20 is formed by the beam members 12 pressing into a leveled face when leveling a pavement face and moving in the direction of travel for leveling while the beam members are being pressed down.