Problem

Modular and prefabricated construction methods face inefficiencies in foundation construction, requiring extensive on-site work, labor, and varying quality due to disconnect between centralized manufacturing and distributed site preparation, leading to poor connections and increased costs.

Innovation Solution

The EARTH TRUSS system, comprising A-frame-shaped truss foundations with screw anchors and pre-cast concrete slabs, allows for rapid, precise, and waterproof foundation assembly with minimal site preparation, enabling centralized manufacturing and shipping of foundation components for quick on-site assembly.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Manufacturing precision

If traditional distributed foundation construction methods are used, then local adaptability is achieved, but manufacturing precision and connection quality deteriorate due to hand tools and varying site conditions

Engineering Contradiction:
Improvefoundation connection precisionVSAvoidfoundation construction system
Core Design Contradiction:
Manufacturing precisionVSDevice complexity

Solution Approach 1:

The foundation system is divided into modular precast concrete elements with standardized interfaces, allowing centralized precision manufacturing while maintaining adaptability through modular assembly. Each module can be independently manufactured with high precision using automated equipment, then assembled on-site to accommodate various site conditions.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

A universal foundation module design is implemented that can serve multiple structure types and site conditions through standardized connection interfaces. The modular system provides multi-functionality by adapting to different soil conditions, building types, and site requirements while maintaining consistent manufacturing precision through standardized production processes.

Inventive Principle:
Principle #6Universality (Multi-functionality)

2Productivity

If extensive on-site foundation preparation is performed, then site adaptability is achieved, but construction time and labor costs increase

Engineering Contradiction:
Improvefoundation construction speedVSAvoidonsite preparation time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

Foundation elements are pre-prepared and pre-assembled in centralized facilities before delivery to the construction site. This preliminary action includes manufacturing precision, initial quality control, and pre-assembly of modular components, which significantly reduces on-site preparation time and accelerates overall construction productivity.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The modular precast system skips traditional time-consuming on-site foundation preparation steps such as extensive formwork, rebar tying, and concrete curing by delivering pre-manufactured foundation elements that can be rapidly installed, thereby rushing through the foundation construction phase and improving productivity.

Inventive Principle:
Principle #21Skipping (Rushing through)

3Manufacturing precision

If centralized factory construction is used for modular structures, then manufacturing precision is improved, but on-site foundation connection quality deteriorates due to disconnect between manufacturing and site preparation

Engineering Contradiction:
Improvestructure fabrication precisionVSAvoidstructure-foundation connection
Core Design Contradiction:
Manufacturing precisionVSReliability

Solution Approach 1:

The foundation modules and structural components are manufactured using the same centralized factory processes, ensuring homogeneous quality standards, materials, and precision levels across all elements. This eliminates the disconnect between structure and foundation manufacturing, as both are produced under identical controlled conditions with consistent quality assurance protocols.

Inventive Principle:
Principle #33Homogeneity

Solution Approach 2:

The foundation system and structural components are designed as an integrated assembly produced in the same centralized facility. This merging of foundation and structure manufacturing ensures coordinated design, consistent quality control, and reliable connections, eliminating the reliability issues caused by separate manufacturing processes and improving overall connection quality.

Inventive Principle:
Principle #5Merging (Combining)

4Adaptability or versatility

If multiple regional contractors are hired for foundation work, then local expertise is utilized, but project coordination complexity and costs increase

Engineering Contradiction:
Improvesite condition adaptationVSAvoidcontractor coordination system
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The standardized modular foundation system provides universal adaptability to various site conditions through its modular design and standardized interfaces, eliminating the need to hire multiple specialized regional contractors. A single coordinated team can install the universal modules across different site conditions, reducing coordination complexity while maintaining versatility.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The foundation system uses standardized parameters and dimensions that can be adapted to different site conditions through configuration rather than customization. This allows a single contractor team to handle various site requirements by adjusting module arrangements and configurations, rather than requiring multiple specialized contractors with different expertise.

Inventive Principle:
Principle #35Parameter changes

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

This approach simplifies and accelerates foundation construction, reducing labor and site preparation needs, ensuring consistent quality and cost-effectiveness across various site conditions, and aligning with the precision and efficiency of prefabricated structure manufacturing.

Implementation Method 1

a rotary driver is used to rotate the screw anchors into the ground

Methodology Applied
Scientific EffectFriction: Friction

Implementation Method 2

screw anchors...secured to a building structure

Methodology Applied
Scientific EffectMechanical interlocking: Mechanical Fastener

Data Source

PatentUS11926981B2Screw anchor foundations and related interfaces for modular, manufactured and prefabricated structures
Publication Date: 2024.03.12 NEXTPOWER LLC
  • US11926981B2 patent drawing
  • US11926981B2 patent drawing
  • US11926981B2 patent drawing

AI summary

A foundation system for manufactured homes, prefabricated houses, and other structures. Multiple screw anchors are driven into the ground at the desired location of the structure. Preformed grade bars may be placed over the screw anchors to provide a modular foundation without pouring concrete or digging footers. Alternatively, adapters may be attached to one or more of the driven screw anchors to provide a pedestal to receive the grade bar or prefabricated sections of concrete.