Segmented Coil Drain Pan Assembly for Condensate Overflow Redundancy

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing air-conditioning systems face issues with drain pan occlusion, rust, and overflow, leading to additional costs and time for installation and plumbing of auxiliary drain pans, which lack redundancy and efficiency in handling condensate overflow.

Innovation Solution

A segmented drain pan system where a primary drain pan and an auxiliary drain pan are integrated and plumbed together, allowing for simultaneous leveling and plumbing, with the auxiliary pan activated only at an overflow level, reducing the need for separate installation and plumbing of additional components.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If separate auxiliary drain pans are installed individually, then redundancy for overflow protection is achieved, but installation time and cost increase significantly

Engineering Contradiction:
Improveoverflow protection redundancyVSAvoidinstallation time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent combines multiple drain pans (primary and auxiliary) into a single integrated segmented pan assembly that is pre-leveled and pre-plumbed during manufacturing. This merging of separate components into one unit eliminates the need for installers to individually level and plague multiple pans, significantly reducing installation time while maintaining the redundancy overflow protection function.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The drain pans are pre-leveled and pre-plumbed during the manufacturing process before installation. This preliminary action ensures that the pans are correctly positioned and connected to drainage systems before reaching the installation site, eliminating time-consuming field leveling and plumbing operations while ensuring proper overflow protection functionality.

Inventive Principle:
Principle #10Preliminary action

2Reliability

If multiple separate drain pans are installed, then overflow protection is provided, but the complexity of installation and plumbing increases

Engineering Contradiction:
Improveoverflow protectionVSAvoidinstallation complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

Multiple drain pans are merged into a single integrated assembly with common leveling and plumbing requirements. This reduces the complexity by transforming what would be multiple independent installation tasks into one unified installation process, while maintaining multiple levels of overflow protection.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The segmented pan assembly serves multiple functions simultaneously: it provides primary drainage, auxiliary overflow protection, and is designed to accommodate different installation orientations (horizontal, vertical, slanted). This multi-functionality reduces the need for additional specialized components and simplifies the overall installation process.

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Adaptability or versatility

If individual drain pans are installed without pre-leveling, then flexibility in installation is maintained, but additional leveling time and precision requirements increase

Engineering Contradiction:
Improveinstallation flexibilityVSAvoidleveling time
Core Design Contradiction:
Adaptability or versatilityVSLoss of time

Solution Approach 1:

The drain pans are pre-leveled during manufacturing with built-in leveling features such as integrated support legs or adjustable mounting mechanisms. This preliminary leveling action maintains installation flexibility by allowing the pre-leveled unit to be installed in various orientations while eliminating the need for time-consuming field leveling operations.

Inventive Principle:
Principle #10Preliminary action

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

This solution enhances installation efficiency, reduces costs, and provides redundancy without the need for external auxiliary drain pans, ensuring effective condensate management and preventing damage from overflow.

Implementation Method 1

a first segment of the segmented pan may comprise a primary drain pan positioned to receive the condensate from the evaporator coil. A second segment of the segmented pan may comprise an auxiliary drain pan, which receives the condensate only after an overflow level of condensate is reached in the primary drain pan.

Methodology Applied
Scientific EffectGravity: Gravitation

Data Source

PatentUS8869548B2Coil with built-in segmented pan comprising primary and auxiliary drain pans and method
Publication Date: 2014.10.28 ASPEN MFG
  • US8869548B2 patent drawing
  • US8869548B2 patent drawing
  • US8869548B2 patent drawing

AI summary

An air-conditioning system provides a segmented pan with a primary drain segment and a built in auxiliary drain pan segment to receive overflow condensate from the primary drain pan and drains through auxiliary drain lines. The built-in auxiliary drain pan and primary drain pan are plumb with respect to each other and are secured together and/or monolithic. The assembly construction thereby provides reduced time and costs associated with storing, transporting, installing, leveling, and plumbing individual components.