Server Usage Prediction for Dynamic Decommissioning

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Large data centers face inefficiencies due to varying computational demands, leading to over-provisioning and waste of resources as they run all servers constantly, even when demand is low, making it impractical to decommission underutilized servers in large systems.

Innovation Solution

A server tool that collects historical usage data, predicts future usage by analyzing trends and patterns, and takes actions such as decommissioning underutilized servers or recommending upgrades to ensure resource availability for peak demands.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If a data center runs all available servers to meet computational demands, then reliability is improved, but resource waste increases due to underutilized servers during low demand periods

Engineering Contradiction:
Improvecomputational service availabilityVSAvoidserver power consumption
Core Design Contradiction:
ReliabilityVSLoss of energy

Solution Approach 1:

The system dynamically adjusts server provisioning based on predicted demand. The server tool continuously collects historical usage data, predicts future server usage patterns, and automatically provisions or decommissions servers to match anticipated demand levels. This dynamic approach allows the data center to maintain reliability during high demand while reducing energy consumption during low demand periods, resolving the contradiction between keeping servers running for availability and shutting them down to save energy.

Inventive Principle:
Principle #15Dynamics

2Reliability

If a data center over-provisions server systems to meet the highest levels of demand, then reliability is improved, but device complexity increases due to managing thousands of servers

Engineering Contradiction:
Improvepeak demand capabilityVSAvoidserver system management
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The server tool implements self-service automation for server provisioning and decommissioning. Instead of requiring manual administration of thousands of servers, the system autonomously monitors historical usage patterns, predicts future demand, and automatically provisions or decommissions servers as needed. This self-service capability dramatically reduces the complexity of managing large server fleets while maintaining the ability to meet peak demand, as the automated system handles the coordination and management tasks that would otherwise require extensive human resources.

Inventive Principle:
Principle #25Self-service

3Adaptability or versatility

If a data center maintains a large number of servers to meet varying computational demands, then adaptability is improved, but loss of time increases due to the impracticality of manual decommissioning and re-provisioning

Engineering Contradiction:
Improvedemand variation responseVSAvoidserver decommissioning and re-provisioning time
Core Design Contradiction:
Adaptability or versatilityVSLoss of time

Solution Approach 1:

The system performs preliminary actions by predicting future server usage patterns before demand changes occur. The server tool analyzes historical data to forecast upcoming demand increases or decreases, and proactively provisions or decommissions servers in advance. This preliminary action allows the data center to be adapted to varying computational demands without the time loss associated with reactive manual decommissioning and re-provisioning, as servers are already in the correct state when demand changes occur.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS10956839B2Server tool
Publication Date: 2021.03.23 BANK OF AMERICA CORP
  • US10956839B2 patent drawing
  • US10956839B2 patent drawing
  • US10956839B2 patent drawing

AI summary

A memory stores a log that includes first, second, and third datasets each containing server information collected at different times. The processor forms vectors from the datasets, calculates distance vectors between them and uses the distance vectors and pairwise angles between distance vectors to predict a dataset for a first future time. When the first future time arrives, the processor collects the server information, stores it in a fourth dataset, and calculates a variance between that dataset and the predicted dataset. Using the variance, distance vectors, and angles, the processor determines a second predicted dataset corresponding to a second future time, from which it determines a server usage prediction. If the server usage prediction is below a decommission threshold, the processor decommissions the server. If the server usage prediction is above a capacity threshold, the processor generates a report advising an administrator to upgrade or remove projects from the server.