Current methods for transmitting work plans to construction machinery operators are prone to errors and dependent on the operator's skill level, leading to variations in work quality and efficiency.

Innovation Solution

A method involving wireless communication to obtain and display information about construction machinery, including location, posture, and state, to create and transmit work plans using a server, which can include monitoring and remotely controlling automatic machinery.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If a site administrator delivers a paper printed drawing, marks a work area directly on a work site surface, or verbally explains the work plan, then the work plan can be transmitted to the operator, but errors may occur during transmission and it may take a lot of time depending on the size of the site

Engineering Contradiction:
Improvework plan transmission accuracyVSAvoidwork plan transmission time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent replaces manual mechanical transmission methods (paper drawings, physical marking, verbal explanation) with an electronic information processing system. The server stores work plan data electronically and transmits it to terminals, eliminating the need for physical media and manual communication, thereby improving both accuracy and efficiency of work plan transmission

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Solution Approach 2:

The patent introduces a server as an intermediary between the work plan creator and the construction machinery operator. The server stores, manages, and transmits work plan information electronically, acting as a centralized mediator that ensures accurate and efficient communication of work plans to multiple terminals simultaneously

Inventive Principle:
Principle #24Intermediary (Mediator)

2Ease of operation

If only a target drawing is transmitted and the work plan is established by the operator of the construction machinery, then the transmission process is simplified, but the work quality and speed are inevitably dependent on the skill level of the operator

Engineering Contradiction:
Improvework plan establishment simplicityVSAvoidwork quality consistency
Core Design Contradiction:
Ease of operationVSManufacturing precision

Solution Approach 1:

The patent implements a feedback mechanism where the server transmits not only the target drawing but also reference information, historical data, and guidance materials to the operator's terminal. This feedback loop provides operators with additional support information that helps them establish work plans more accurately and consistently, reducing dependence on individual skill levels

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The server performs preliminary preparation of work plan information, organizing and pre-processing data including target drawings, reference materials, and operational guidelines before transmission. This preliminary action ensures that operators receive comprehensive, pre-processed information that reduces the complexity of their task and improves consistency in work plan establishment

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS12182745B2Method of making work plans for construction machinery
Publication Date: 2024.12.31 HD CONSTRUCTION EQUIPMENT CO LTD
  • US12182745B2 patent drawing
  • US12182745B2 patent drawing
  • US12182745B2 patent drawing

AI summary

In a method of making work plans for construction machinery, information of the construction machinery at a work site is obtained. The information of the construction machinery is received via a wireless communication. The information of the construction machinery is displayed on a display portion of a server. A work plan of the construction machinery is created on the display portion of the server by using the information of the construction machinery and information stored in the server. The work plan is transmitted to the construction machinery.