Set-Delayed Cement Using Synthetic Smectite

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Set-delayed cement compositions used in subterranean cementing operations face challenges such as gelation issues and limited compressive strength at lower temperatures, and require solutions to adjust density while maintaining stability, especially in offshore operations where space is limited.

Innovation Solution

The development of lightweight stabilized set-delayed cement compositions comprising water, pumice, hydrated lime, synthetic smectites, and a set retarder, which remain in a pumpable fluid state for extended periods and develop reasonable compressive strengths at low temperatures, using additives like synthetic smectites and dispersants to enhance stability and adjust density.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Duration of action of stationary object

If set-delayed cement compositions are prepared with Portland cement, then the cement can be stored for extended periods, but gelation issues occur that limit use and effectiveness

Engineering Contradiction:
Improvestorage periodVSAvoidgelation stability
Core Design Contradiction:
Duration of action of stationary objectVSReliability

Solution Approach 1:

The patent changes the chemical composition parameters by substituting Portland cement with a blend of hydrated lime and quartz, and adding specific additives (synthetic smectite, dispersants, retarders) to modify the rheological and setting properties. This parameter change allows extended storage without gelation while maintaining reliable performance when activated.

Inventive Principle:
Principle #35Parameter changes

Solution Approach 2:

The patent introduces intermediary substances including synthetic smectite (a clay mineral), dispersants, and retarders that mediate between the cement components and water. These intermediaries prevent harmful gelation during storage while enabling proper setting when activated, resolving the contradiction between storage duration and reliability.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Reliability

If set-delayed cement compositions use hydrated lime and quartz, then gelation issues are reduced, but compressive strength is insufficient at lower temperatures

Engineering Contradiction:
Improvegelation stabilityVSAvoidcompressive strength at low temperature
Core Design Contradiction:
ReliabilityVSStrength

Solution Approach 1:

The patent creates a composite cement composition combining hydrated lime, quartz, synthetic smectite, and chemical additives. This composite material achieves both gelation stability and adequate compressive strength at low temperatures by synergistic interaction of components, particularly the smectite-clay complex that provides structural integrity in cold conditions.

Inventive Principle:
Principle #40Composite materials

Solution Approach 2:

The patent modifies the chemical and physical parameters of the cement system by optimizing the ratios of lime to quartz, selecting specific synthetic smectite types, and adjusting additive concentrations. These parameter changes enable the composition to develop sufficient compressive strength at low temperatures while maintaining gelation stability during storage.

Inventive Principle:
Principle #35Parameter changes

3Stress or pressure

If cement density is increased to match formation pressure, then well control is improved, but the composition becomes less stable during storage

Engineering Contradiction:
Improveformation pressure matchingVSAvoidslurry stability
Core Design Contradiction:
Stress or pressureVSStability of the object's composition

Solution Approach 1:

The patent changes the density parameter by incorporating high-density materials such as barite or iron oxide into the hydrated lime-quartz-smectite system. Simultaneously, it adjusts the rheological parameters through dispersants and clay content to maintain stability, resolving the contradiction between pressure matching and compositional stability.

Inventive Principle:
Principle #35Parameter changes

Solution Approach 2:

The patent uses dispersants and synthetic smectite as intermediary substances that prevent particle aggregation and settling in high-density slurries. These intermediaries maintain slurry stability even when dense materials are added for formation pressure matching, allowing both objectives to be achieved simultaneously.

Inventive Principle:
Principle #24Intermediary (Mediator)

4Strength

If offshore cementing operations use traditional cement compositions, then adequate strength is achieved, but on-site equipment and storage space requirements increase

Engineering Contradiction:
Improvecompressive strengthVSAvoidon-site storage and mixing space
Core Design Contradiction:
StrengthVSArea of stationary object

Solution Approach 1:

The patent applies preliminary action by pre-mixing and pre-stabilizing the cement composition with hydrated lime, quartz, synthetic smectite, and additives in a factory setting. This allows the composition to be stored in a stable, pumpable state for extended periods, eliminating the need for large on-site bulk storage facilities and extensive mixing equipment typically required for traditional Portland cement operations.

Inventive Principle:
Principle #10Preliminary action

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

These compositions remain stable and develop adequate compressive strength at low temperatures, suitable for a range of subterranean formations, and can be easily transported and stored, reducing the need for on-site equipment and space, while maintaining fluidity for extended periods.

Implementation Method 1

synthetic smectites and dispersants to enhance stability

Methodology Applied
Scientific EffectAdsorption: Adsorption

Implementation Method 2

lightweight stabilized set-delayed cement compositions comprising water, pumice

Methodology Applied
Scientific EffectBuoyancy: Archimedes' Principle (Buoyancy)

Implementation Method 3

hydrated lime, and a set retarder, which remain in a pumpable fluid state for extended periods and develop reasonable compressive strengths at low temperatures

Methodology Applied
Scientific EffectChemical Bonding: Chemical Bonding

Implementation Method 4

a set retarder, which remain in a pumpable fluid state for extended periods

Methodology Applied
Scientific EffectChemical Bonding: Chemical Bonding

Data Source

PatentUS10087358B2Use of synthetic smectite in set-delayed cement compositions comprising pumice
Publication Date: 2018.10.02 HALLIBURTON ENERGY SERVICES INC
  • US10087358B2 patent drawing
  • US10087358B2 patent drawing

AI summary

Disclosed herein are cement compositions using set-delayed cement compositions in subterranean formations. The composition may comprise a set-delayed cement composition comprising pumice, hydrated lime, a cement set retarder, a synthetic smectite, and water.