Problem

Current wireless communication networks face challenges in effectively handling partial node failures, particularly during Idle Mode Signaling Reduction (ISR), which can lead to interruptions in service and difficulties in re-establishing or deleting affected PDN connections.

Innovation Solution

The implementation of a method within the MME, PGW, and S4-SGSN nodes to receive and process notifications of partial failures, identify affected user equipment, and send failure notification messages to re-establish or delete PDN connections, ensuring minimal service interruptions by maintaining identification information and applying restrictions during ISR.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If partial node failure handling procedures are implemented during ISR, then service continuity is improved, but network complexity increases

Engineering Contradiction:
Improveservice continuityVSAvoidnetwork complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The patent segments the failure handling by identifying specific affected PDN connections through SGW FQ-CSID and MME FQ-CSID identifiers, allowing selective re-establishment or deletion of only the impacted connections rather than handling all connections uniformly. This targeted approach maintains service continuity for unaffected connections while managing complexity through precise failure isolation.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The MME acts as an intermediary node that receives failure notifications from the SGW and coordinates the recovery process by sending failure notification messages to the S4-SGSN. This intermediary role centralizes the failure handling logic, improving service continuity through coordinated recovery while managing network complexity by consolidating control in a single node.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Reliability

If failure notification messages are sent to re-establish PDN connections, then service delivery is improved, but signaling overhead increases

Engineering Contradiction:
Improveservice deliveryVSAvoidsignaling overhead
Core Design Contradiction:
ReliabilityVSLoss of information

Solution Approach 1:

The patent stores FQ-CSID identification information in advance during normal operation, including the SGW FQ-CSID and MME FQ-CSID mappings. When a partial failure occurs, this pre-stored information enables immediate identification of affected PDN connections without requiring additional discovery signaling, thus improving service delivery while minimizing signaling overhead during the recovery phase.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The failure notification message includes copied identification information (SGW FQ-CSID and MME FQ-CSID) that was previously established during connection setup. By reusing and copying this existing identification data rather than transmitting new or more extensive information, the patent enables efficient PDN connection re-establishment while keeping signaling overhead minimal.

Inventive Principle:
Principle #26Copying

Data Source

PatentUS9219643B2Node and method for the handling of serving gateway partial failure
Publication Date: 2015.12.22 TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)
  • US9219643B2 patent drawing
  • US9219643B2 patent drawing
  • US9219643B2 patent drawing

AI summary

Example embodiments presented herein are directed towards improved handling during Serving Gateway (SGW) partial failures. Some of the example embodiments are directed towards a Mobility Management Entity (MME) configured to alter a S4 Serving General Packet Radio Service Support Node (S4-SGSN) that a SGW partial failure has occurred. Some of the example embodiments are directed towards a Packet Data Network Gateway (PGW) being informed that ISR for a user equipment is activated, this the PGW will save any MME related identification information for a user equipment undergoing a mobility procedure when ISR is activated.