Problem

Existing shear ram assemblies in blowout preventers may fail to completely shear a pipe string if it is off-centered relative to the bore, leading to incomplete cutting due to the pipe remaining against the side wall during closure.

Innovation Solution

A shear ram assembly with guide arms that protrude from one ram block and have wedge surfaces to guide the pipe toward the axis of the bore, ensuring the pipe is centered and completely sheared, even if initially off-center, by sliding over the other ram block's blade when moved to a closed position.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If the shear ram assembly uses conventional blades without guide arms, then the structure is simpler, but the pipe string may remain off-centered against the side wall during closure, leading to incomplete shearing

Engineering Contradiction:
Improvecomplete shearing of pipe stringVSAvoidstructure of shear ram assembly
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The shear ram assembly is divided into functional components: the ram body, the cutting blades, and the guide arms. The guide arms are separate elements that can be independently positioned and adjusted, allowing them to perform the specific function of centering the pipe without interfering with the cutting action of the blades.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The guide arms perform a preliminary action by centering the pipe string against the bore axis before the cutting blades engage. This preliminary centering action ensures that when the blades close, the pipe is properly positioned for complete shearing, preventing the problem of incomplete cuts that would occur if the pipe remained off-centered.

Inventive Principle:
Principle #10Preliminary action

2Adaptability or versatility

If the pipe string is off-centered relative to the bore axis, then the initial positioning is more flexible, but the pipe may remain against the side wall during closure, causing incomplete shearing

Engineering Contradiction:
Improveacceptance of off-centered pipe positioningVSAvoidcomplete shearing of pipe string
Core Design Contradiction:
Adaptability or versatilityVSReliability

Solution Approach 1:

The guide arms act as an intermediary mechanism between the off-centered pipe string and the cutting blades. They transfer and redirect the pipe string from its off-centered position to the centered position on the bore axis, mediating the transition smoothly and ensuring that the pipe is properly positioned for cutting regardless of its initial position.

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

Before the cutting action occurs, the guide arms perform a preliminary centering action on the pipe string. This preliminary action corrects any off-centered positioning, ensuring that when the blades engage, the pipe is aligned with the bore axis for reliable complete shearing.

Inventive Principle:
Principle #10Preliminary action

3Reliability

If guide arms are added to center the pipe, then complete shearing is ensured, but the device complexity increases

Engineering Contradiction:
Improvecomplete shearing of pipe stringVSAvoidnumber of components in shear ram assembly
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The guide arms serve multiple functions: they center the pipe string against the bore axis, guide the pipe during the closing motion, and protect the cutting blades from lateral forces. By combining these functions into a single component, the design achieves reliable complete shearing without proportionally increasing complexity.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The shear ram assembly is segmented into distinct functional modules, with the guide arms as a separate, manageable component. This segmentation allows for easier manufacturing, assembly, and maintenance, reducing the practical impact of the added complexity while maintaining the reliability benefits.

Inventive Principle:
Principle #1Segmentation

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

The guide arms effectively center the pipe string, ensuring complete shearing and preventing incomplete cuts by directing the pipe toward the axis, thus ensuring the pipe is fully severed regardless of its initial position within the bore.

Implementation Method 1

Each of the guide arms has a tip and a wedge surface on an inboard side extending rearward from the tip. The wedge surfaces are farther apart from each other than the blade and guide the pipe string toward an axis of the bore

Methodology Applied
Scientific EffectWedge: Wedge

Data Source

PatentEP2535509B1Pipe guide arms for blind shear rams
Publication Date: 2017.08.09 HYDRIL USA MANUFACTURING LLC
  • EP2535509B1 patent drawingFigure 1
  • EP2535509B1 patent drawingFigure 2~5
  • EP2535509B1 patent drawingFigure 3~4

AI summary

A pipe shear ram assembly (11) has a housing (73) having a bore (75) extending vertically therethrough for the passage of a pipe string (77). Ram blocks (13, 51) have blades (17, 63) positioned such that one slides over the other when the first and second ram blocks (13, 51) are moved toward each other to shear a well pipe (77). A pair of guide arms (25) extend from one of the rams (13). The guide arms (25) have tips (29) protruding a greater distance than the blade (17). Each of the guide arms (25) has an inboard wedge surface (31) beginning at the tip (29) and extending along a line that intersects the longitudinal axis (28) for guiding the pipe string (77) toward a bore axis (79) of the bore (75) in the event the first and second ram blocks (13, 51) are moved to the closed position.