Problem

The installation of sheathing on buildings is labor-intensive, particularly for the lowest row, and the bottom edge is exposed to water, risking damage from splashed water and erosion.

Innovation Solution

A sheath-protecting bracket comprising a back plate, bottom plate, and front plate with block spacers and drain holes, designed to hold sheathing in place during installation and protect it from water contact, featuring a kicker strip for proper siding alignment and double-side tape for weatherproofing.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Object-affected harmful factors

If sheathing is installed by hand without a bracket, then the installation process is simple, but the bottom edge of the sheathing is exposed to water damage and the process is labor-intensive

Engineering Contradiction:
Improvewater damage to sheathingVSAvoidinstallation system complexity
Core Design Contradiction:
Object-affected harmful factorsVSDevice complexity

Solution Approach 1:

A bracket system is introduced as an intermediary component between the sheathing and the building structure. The bracket includes a back plate attached to the building, a bottom plate extending below the sheathing, and a front plate with block spacers that hold the sheathing in place. This intermediary structure protects the sheathing from water damage while maintaining a relatively simple installation process.

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The bracket is pre-assembled with block spacers and drain holes before installation. The block spacers are positioned to hold the sheathing at the correct elevation, and the drain holes are pre-drilled to facilitate water drainage. This preliminary preparation reduces installation time and labor while ensuring proper sheathing protection from the start.

Inventive Principle:
Principle #10Preliminary action

2Object-affected harmful factors

If ground clearance minimum of 6 inches is observed, then sheathing is protected from standing water, but splashed water can still contact the sheathing and grade elevation can reduce separation

Engineering Contradiction:
Improvewater contact with sheathingVSAvoidinstallation ease
Core Design Contradiction:
Object-affected harmful factorsVSEase of operation

Solution Approach 1:

The bracket system serves as a mediator that extends the protection below the sheathing. The bottom plate extends 2-4 inches below the bottom edge of the sheathing, creating a protective barrier that prevents splashed water from reaching the sheathing. This intermediary structure provides enhanced protection without requiring workers to manually position the sheathing at precise elevations.

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The bracket system is designed to be self-positioning through the block spacers that protrude from the bottom plate. When the sheathing is placed on the block spacers, it automatically achieves the correct elevation and alignment. The drain holes in the bottom plate allow water to drain away automatically, providing self-service water management without additional components.

Inventive Principle:
Principle #25Self-service

3Ease of operation

If lowest row of sheathing is held in place by workers, then sheathing can be positioned, but the process is labor-intensive and time-consuming

Engineering Contradiction:
Improvesheathing positioning easeVSAvoidinstallation speed
Core Design Contradiction:
Ease of operationVSProductivity

Solution Approach 1:

The block spacers attached to the bottom plate serve as an intermediary positioning mechanism. These spacers protrude upward and provide ledges on which the sheathing rests. This eliminates the need for workers to manually hold the sheathing in place, as the spacers automatically position and support the sheathing at the correct location and elevation.

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The bracket system provides self-positioning functionality through the block spacers. When sheathing is placed on the spacers, it automatically achieves proper alignment and elevation without requiring manual positioning by workers. This self-service positioning mechanism significantly reduces labor requirements and increases installation speed.

Inventive Principle:
Principle #25Self-service

Data Source

PatentUS11492809B1Building sheathing protecting bracket
Publication Date: 2022.11.08 RANDLE BROS DEVELOPING LLC
  • US11492809B1 patent drawing
  • US11492809B1 patent drawing
  • US11492809B1 patent drawing

AI summary

A system and device for mounting and protecting exterior sheathing on a building. The system comprises a sheath-protecting bracket coupled to a wall with a sheath panel coupled to the wall with a bottom edge of the sheath panel positioned in the sheath-protecting bracket. The sheath-protecting bracket comprises a back plate, a bottom plate coupled to a bottom edge of the back plate, a front plate with a bottom edge coupled to the bottom plate. The sheath-protecting bracket has one or more spacers coupled to a front of the back plate to support the sheathing while allowing any moisture in the sheathing to weep out and fall into gaps above the bottom plate. A plurality of drain holes through the bottom plate allows water to drain out of the sheath-protecting bracket.