Shoring Wall Installation with Pre-Drilling and Caisson Guidance

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional methods for constructing shoring walls in difficult ground conditions, such as hard or abrasive ground, often damage the integrity of painted coatings on metal sheets and are limited by noise and vibration, especially when using glass fibre reinforced plastic or composite materials.

Innovation Solution

An insertable element with a shaped wall and connection section that allows for the use of an excavation means within a caisson or casing, enabling the installation of pile elements without damaging the coating, and a method that includes a releasable locking mechanism and expandable drilling bits to minimize noise and vibration.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If conventional methods (pushing, vibrating, hammering) are used to install pile elements in hard ground, then the pile elements can be installed, but the painted coating on metal sheets is damaged

Engineering Contradiction:
Improveinstallation capabilityVSAvoidcoating damage
Core Design Contradiction:
ProductivityVSObject-affected harmful factors

Solution Approach 1:

The patent applies preliminary action by pre-drilling holes in the hard ground before inserting the pile elements. This preparatory step creates ready-made cavities that eliminate the need for forceful installation methods that would damage the painted coating on metal sheets.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The invention extracts the problematic installation process (pushing, vibrating, hammering) and replaces it with a two-step process: first drilling the hole, then gently inserting the element. This separation removes the harmful mechanical stresses from the coating surface.

Inventive Principle:
Principle #2Taking out (Extraction)

2Adaptability or versatility

If glass fibre reinforced plastic or composite sheet is used in hard ground, then material versatility is improved, but the problem of installation difficulty is exacerbated

Engineering Contradiction:
Improvematerial selectionVSAvoidinstallation ease
Core Design Contradiction:
Adaptability or versatilityVSEase of operation

Solution Approach 1:

By pre-drilling holes in the ground, the patent creates ready-made cavities that accommodate various materials including glass fibre reinforced plastic and composite sheets. This preliminary preparation eliminates the need for forceful installation methods that would be particularly damaging to these sensitive composite materials.

Inventive Principle:
Principle #10Preliminary action

3Reliability

If painting or coating is applied to metal sheet, then corrosion protection is improved, but noise and vibration during installation increase

Engineering Contradiction:
Improvecorrosion protectionVSAvoidnoise and vibration
Core Design Contradiction:
ReliabilityVSObject-affected harmful factors

Solution Approach 1:

The pre-drilling step creates cavities before the coated metal sheets are inserted. This allows the coated elements to be gently placed into the pre-prepared holes without requiring forceful driving methods that generate noise and vibration, thereby protecting both the coating integrity and reducing environmental noise.

Inventive Principle:
Principle #10Preliminary action

4Productivity

If mandrel or pre-drilling is used in hard ground, then installation feasibility is improved, but device complexity increases

Engineering Contradiction:
Improveinstallation feasibilityVSAvoidequipment complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The patent uses simple pre-drilling equipment to create holes in the hard ground before inserting the pile elements. This approach achieves installation feasibility in difficult ground conditions using straightforward drilling machinery rather than complex specialized installation equipment.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS11692324B2Wall element system and method and apparatus for constructing shoring walls
Publication Date: 2023.07.04 SOUTHERN SEAWALL SOLUTIONS PTY LTD
  • US11692324B2 patent drawing
  • US11692324B2 patent drawing
  • US11692324B2 patent drawing

AI summary

A caisson or casing 107 for installing a sheet 102/103 into a ground or underwater location, the caisson 107 having a shaped wall 107.1, which is open for a predetermined length and is adapted to receive and connect to an excavation means 3 within the confines of the caisson or casing 107. In at least one embodiment, the system includes a drilling assembly 3 for insertion of a caisson or casing 1, the drilling assembly 3 having one or more expanding drill bits 4 which are adapted to be driven by a drilling or rotation motive device 5, the expanding drill bits 4 being adapted to be arranged with respect to the caisson or casing 1 in use, so as form a hole or bore which substantially conforms to, or substantially overlaps with, the shape of the caisson or casing 1.