Skid-Resistant Sheathing Panels with Integrated Barrier

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing roofing and wall sheathing systems face challenges with gaps between panels leading to water leakage, slippery surfaces due to impermeable materials, and inefficient installation processes, particularly in terms of moisture resistance and skid resistance.

Innovation Solution

The development of structural panels with a mass-transfer barrier and seam sealing means that are both bulk water resistant and skid resistant, featuring a textured surface for improved traction and a permeable barrier layer applied during manufacturing to facilitate efficient installation and prevent moisture buildup.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If an impermeable barrier layer (felt paper) is added to prevent bulk water penetration, then water resistance is improved, but skid resistance deteriorates and installation complexity increases

Engineering Contradiction:
Improvebulk water resistanceVSAvoidskid resistance
Core Design Contradiction:
ReliabilityVSEase of operation

Solution Approach 1:

The patent uses a composite material system consisting of structural panels combined with a permeable barrier layer that has both water-resistant and skid-resistant properties. The barrier layer is formulated to provide multiple functions simultaneously: preventing bulk water penetration while maintaining adequate traction, thereby resolving the contradiction between water resistance and skid resistance.

Inventive Principle:
Principle #40Composite materials

Solution Approach 2:

The patent modifies the physical and chemical parameters of the barrier layer to achieve optimal performance. By adjusting the composition, texture, and surface properties of the barrier layer, it becomes both water-resistant and skid-resistant, eliminating the need for separate layers for each function and improving installation efficiency.

Inventive Principle:
Principle #35Parameter changes

2Reliability

If an impermeable barrier layer is added to prevent bulk water penetration, then water resistance is improved, but installation time and complexity increase

Engineering Contradiction:
Improvebulk water resistanceVSAvoidinstallation time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent merges the barrier layer with the structural panels into a single integrated component. The permeable barrier layer is attached to the structural panels during manufacturing, creating a pre-assembled unit that reduces on-site installation steps. This integration eliminates the need for separate installation of barrier layers and panel assembly, significantly reducing installation time while maintaining water resistance.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The barrier layer is pre-attached to the structural panels during manufacturing before installation at the construction site. This preliminary action of pre-assembling the barrier layer and panels together eliminates the need for workers to install the barrier layer separately during construction, thereby reducing installation time and complexity.

Inventive Principle:
Principle #10Preliminary action

3Reliability

If a house wrap is unrolled and spread over walls to prevent moisture passage, then moisture resistance is improved, but installation complexity and labor requirements increase

Engineering Contradiction:
Improvemoisture resistanceVSAvoidinstallation process complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The patent integrates the moisture barrier function directly into the wall sheathing panels by attaching a permeable barrier layer to the panels during manufacturing. This creates a pre-prepared panel assembly that combines structural and moisture protection functions, eliminating the need for separate house wrap installation and reducing overall installation complexity.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The barrier layer is pre-attached to the wall sheathing panels during manufacturing before installation at the construction site. This preliminary action eliminates the need for workers to unroll, spread, and attach house wrap separately during wall installation, significantly simplifying the installation process and reducing labor requirements.

Inventive Principle:
Principle #10Preliminary action

4Reliability

If felt paper is used as a water barrier, then bulk water protection is improved, but the surface becomes slippery and unsafe for workers

Engineering Contradiction:
Improvebulk water protectionVSAvoidsurface slipperiness
Core Design Contradiction:
ReliabilityVSObject-affected harmful factors

Solution Approach 1:

The patent employs a composite material system where the barrier layer is formulated with specific surface properties that provide both water resistance and adequate traction. The composite structure includes a permeable barrier layer with a textured or treated surface that prevents slipping while maintaining bulk water protection capabilities.

Inventive Principle:
Principle #40Composite materials

Solution Approach 2:

The patent changes the surface parameters of the barrier layer through texturing, coating, or material selection to achieve optimal friction characteristics. By adjusting surface roughness, porosity, or composition, the layer becomes skid-resistant while maintaining water barrier functionality, thereby eliminating the slipperiness problem.

Inventive Principle:
Principle #35Parameter changes

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

The solution effectively minimizes water penetration, maintains skid resistance in wet conditions, and simplifies the installation process by providing a pre-equipped, moisture-permeable barrier that reduces the risk of slipping and rot/mold growth, while ensuring adequate protection against bulk water, vapor, and air transfer.

Implementation Method 1

a mass-transfer barrier that is both bulk water resistant and vapor permeable

Methodology Applied
Scientific EffectPermeation: Permeation

Implementation Method 2

featuring a textured surface for improved traction and a permeable barrier layer

Methodology Applied
Scientific EffectFriction: Friction

Data Source

PatentUS7658040B2Panel for sheathing system and method
Publication Date: 2010.02.09 HUBER ENGINEERED WOODS LLC
  • US7658040B2 patent drawing
  • US7658040B2 patent drawing
  • US7658040B2 patent drawing

AI summary

The panel includes a water resistant barrier layer secured atop its outward facing surface. The water resistant barrier layer includes a skid resistant surface. The panels are made of lignocellulosic material. The water resistant and skid resistant surface may include indicia for aligning strips of tape or for aligning fasteners. A method for manufacturing the water resistant building panels is also disclosed and includes the steps of feeding paper onto a forming belt, depositing lignocellulosic material and the binding agent onto the forming belt so as to form a lignocellulosic mat, applying heat and pressure so as to impart the skid resistant surface on the paper, and cutting panels to predetermined sizes.