Construction Slab Insert With Spring Anchor Bolt

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing inserts for construction slabs require separate assembly of anchor bolt members after mold removal, which is inconvenient and time-consuming.

Innovation Solution

An insert with a main body featuring an operation space, a support block with a withdrawal hole, a spring member to elastically support the anchor bolt, and a cover member to seal the space, allowing the anchor bolt to be withdrawn externally when the mold is removed, along with locking grooves and cutting grooves for length control.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If the insert uses a conventional configuration without an embedded anchor bolt, then the mold can be removed cleanly without remaining components, but the anchor bolt must be assembled separately after mold removal which is inconvenient and time-consuming

Engineering Contradiction:
Improveease of anchor bolt assemblyVSAvoidcomplexity of insert structure
Core Design Contradiction:
Ease of operationVSDevice complexity

Solution Approach 1:

The anchor bolt is pre-assembled and embedded within the insert body before mold removal. The insert is designed with a cavity that holds the anchor bolt in place during concrete pouring and mold removal, eliminating the need for separate post-assembly operations.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The anchor bolt and insert are combined into a single integrated component. The anchor bolt is embedded within the insert body, merging two separate elements (insert and anchor bolt) into one unified structure that simplifies installation and eliminates separate assembly steps.

Inventive Principle:
Principle #5Merging (Combining)

2Ease of operation

If the anchor bolt is embedded in the insert body, then separate assembly after mold removal is eliminated, but the anchor bolt needs to be withdrawable through a controlled opening for proper installation

Engineering Contradiction:
Improveease of anchor bolt installationVSAvoidprecision of withdrawal hole positioning
Core Design Contradiction:
Ease of operationVSManufacturing precision

Solution Approach 1:

The withdrawal hole is pre-formed in the insert body at the correct position and orientation before installation. This preliminary preparation ensures that when the anchor bolt needs to be accessed, it can be withdrawn through the pre-positioned opening without requiring additional drilling or positioning operations.

Inventive Principle:
Principle #10Preliminary action

3Productivity

If the insert structure is simplified for easy mold removal, then the anchor bolt cannot be pre-assembled and embedded, requiring separate assembly operations

Engineering Contradiction:
Improveproductivity of insert installationVSAvoidtime for separate anchor bolt assembly
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The insert and anchor bolt are merged into a single pre-assembled unit. This integration allows the entire assembly to be installed in one operation during mold removal, eliminating the time loss associated with separate anchor bolt assembly operations and improving overall productivity.

Inventive Principle:
Principle #5Merging (Combining)

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

Facilitates easy withdrawal and length control of the anchor bolt, eliminating the need for separate assembly and ensuring a firm fixing state, while allowing for adjustable length and compatibility with various slab thicknesses.

Implementation Method 1

a spring member, and a cover member coupled to an upper portion of the main body so as to seal the operation space; an anchor bolt member inserted into the operation space to be pressed to the withdrawal hole by the spring member

Methodology Applied
Scientific EffectElasticity: Elasticity

Data Source

PatentUS11002005B2Insert for construction slab
Publication Date: 2021.05.11 MAKE SOON CO LTD
  • US11002005B2 patent drawing
  • US11002005B2 patent drawing
  • US11002005B2 patent drawing

AI summary

Disclosed is an insert for a construction slab which includes: main body in which an operation space having a planar cross-section of a polygonal shape in an axial direction is formed; a support block which is formed at a lower side of the main body to have a diameter smaller than that of the main body and has a withdrawal hole at an inner side thereof so that a support stepped portion is formed at a lower end of the operation space; a support plate formed at the lower side of the support block to be in contact with a mold; a cover member coupled to an upper portion of the main body so as to seal the operation space; and an anchor bolt member inserted into the operation space to be pressed to the withdrawal hole by a spring member.