Smart Plug Cementing Catalyst Release

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The cement curing time in wellbore cementing operations is lengthy and difficult to monitor or control, leading to increased costs and inefficiencies due to downhole parameters that are hard to manage from the surface.

Innovation Solution

The implementation of smart plugs and smart casing segments equipped with electronic signaling interfaces that trigger the release of chemicals into the cement slurry based on the position of the plugs, accelerating the curing process by releasing a chemical catalyst when the top plug reaches a predetermined position relative to the bottom plug.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Loss of time

If traditional cementing operations are used without monitoring or control mechanisms, then the cement slurry can be pumped and positioned correctly, but the curing time is lengthy and cannot be monitored or controlled from the surface

Engineering Contradiction:
Improvecement curing timeVSAvoidmonitoring and control system complexity
Core Design Contradiction:
Loss of timeVSDevice complexity

Solution Approach 1:

The cementing system performs self-monitoring and self-control through plugs equipped with sensors that detect downhole conditions (temperature, pressure, slug position) and automatically trigger chemical catalyst release when predetermined conditions are met, eliminating the need for complex surface monitoring and manual control operations

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The system incorporates sensors within the plugs that provide real-time feedback on slug position, temperature, and pressure conditions. This feedback mechanism enables automatic control decisions to be made based on actual downhole conditions, optimizing cement curing time while maintaining system reliability

Inventive Principle:
Principle #23Feedback

2Productivity

If the cement curing process is accelerated by adding control mechanisms, then the waiting time on cement is reduced, but the system complexity and difficulty of operation increase

Engineering Contradiction:
Improvedrilling operation speedVSAvoidcementing operation simplicity
Core Design Contradiction:
ProductivityVSEase of operation

Solution Approach 1:

The plugs are pre-configured with sensors, chemical catalysts, and control logic before being deployed into the wellbore. The system is programmed to automatically execute the curing acceleration process when specific conditions are detected, eliminating the need for complex surface operations during the cementing process

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The smart plugs serve as intermediaries between the cement slurry and the surface control system. They contain embedded sensors and chemical release mechanisms that automatically mediate the curing process based on detected conditions, simplifying surface operations while maintaining precise control over the curing timeline

Inventive Principle:
Principle #24Intermediary (Mediator)

3Loss of time

If downhole parameters are monitored and controlled from the surface, then cement curing time can be optimized, but the cost and complexity of the system increase

Engineering Contradiction:
Improvewaiting on cement timeVSAvoidelectronic signaling interface complexity
Core Design Contradiction:
Loss of timeVSDevice complexity

Solution Approach 1:

The plugs perform self-monitoring and self-control functions with embedded sensors and automatic chemical release mechanisms. The system autonomously detects downhole conditions and executes curing acceleration without requiring complex surface monitoring equipment or control systems

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The system replaces complex surface-based mechanical and electronic monitoring/control systems with compact, integrated electronic sensors and chemical release mechanisms embedded within the plugs themselves, reducing overall system complexity while achieving the same optimization goals

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

This approach reduces the cement curing time, allowing for faster resumption of drilling operations and reducing the waiting period on cement, thereby enhancing operational efficiency and cost-effectiveness.

Implementation Method 1

releasing a chemical catalyst when the top plug reaches a predetermined position relative to the bottom plug, accelerating the curing process

Methodology Applied
Scientific EffectCatalysis: Catalysis

Data Source

PatentUS10196308B2Cementing methods and systems employing a smart plug
Publication Date: 2019.02.05 HALLIBURTON ENERGY SERVICES INC
  • US10196308B2 patent drawing
  • US10196308B2 patent drawing
  • US10196308B2 patent drawing

AI summary

A cementing method includes positioning a bottom plug at a casing shoe, rupturing the bottom plug, signaling when a top plug reaches a target position, and releasing a chemical into a cement slurry below the top plug in response to the signaling. The signal may comprise a mechanical trigger changing its position due to movement of the top plug past the target position.