Smart Probe Phase Attribute Measurement

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional high voltage phasing meters require multiple probes, lack data storage, and are difficult for untrained personnel to interpret, with no remote monitoring capabilities for phase sequence data, making them inefficient for measuring phase attributes of electrical grid systems.

Innovation Solution

A single smart probe with a sensing element, processing circuit, and memory that detects zero crossings, applies time tags, and stores samples to determine phase relationships between high voltage electrical lines, allowing for local or remote display and communication of phase data.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If conventional high voltage phasing meters use multiple probes, then measurement capability is achieved, but device complexity and operator difficulty increase

Engineering Contradiction:
Improvephase attribute measurementVSAvoidnumber of probes required
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The patent combines multiple probe functions into a single smart probe that integrates voltage sensing, current sensing, and processing capabilities. The single probe includes a voltage sensing element, current sensing element, and processing circuit that collectively perform measurements previously requiring separate probes, thereby reducing device complexity while maintaining measurement precision

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The smart probe is designed as a universal measuring device that can measure multiple phase attributes (voltage, current, phase relationships) with a single unit. The probe incorporates multiple sensing elements and a processing circuit that enables it to perform various measurement functions that previously required different specialized probes, making the device more versatile and easier to operate

Inventive Principle:
Principle #6Universality (Multi-functionality)

2Loss of information

If conventional phasing meters provide instantaneous display, then real-time measurement is achieved, but data storage and remote monitoring capabilities are lost

Engineering Contradiction:
Improvephase sequence data retentionVSAvoiddata access and interpretation
Core Design Contradiction:
Loss of informationVSEase of operation

Solution Approach 1:

The smart probe incorporates a memory device that stores measured phase attribute data before any analysis or display occurs. This preliminary data capture ensures that all measurement information is preserved, allowing operators to review data at their convenience, perform remote monitoring, and conduct thorough analysis without the pressure of instantaneous interpretation

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent introduces a communication interface as an intermediary between the measurement system and the user/remote systems. This interface enables data transmission to external devices, computers, or monitoring systems, allowing operators to access phase sequence data remotely and interpret it with the aid of specialized software or trained personnel, thereby improving ease of operation for complex data

Inventive Principle:
Principle #24Intermediary (Mediator)

3Measurement precision

If GPS phasing tools use base units and field units, then phase sequencing capability is achieved, but system complexity and cost increase

Engineering Contradiction:
Improvephase sequencing accuracyVSAvoidsystem configuration
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The patent extracts the complex base unit and field unit architecture from the system, replacing it with a single smart probe that contains all necessary measurement and processing capabilities integrated within one device. This eliminates the need for separate base units, field units, and their interconnections, thereby reducing system complexity while maintaining phase sequencing accuracy through the probe's internal processing circuit

Inventive Principle:
Principle #2Taking out (Extraction)

Data Source

PatentUS9164135B2System and method for measuring phase attributes of electrical grid system and equipment using a smart probe
Publication Date: 2015.10.20 HONEYWELL SAFETY PRODUCTS USA INC
  • US9164135B2 patent drawing
  • US9164135B2 patent drawing
  • US9164135B2 patent drawing

AI summary

A system for measuring phase attributes of high voltage electrical lines comprises a single high voltage probe. The probe comprises a sensing element for selectively measuring voltage of a high voltage electrical line. A processing circuit detects zero crossings of the measured voltage, applies a time tag to the zero crossings, and stores samples of the amplitude and time tagged zero crossings. A memory stores samples of the amplitude and time tagged zero crossings for a plurality of high voltage electrical lines. A processor is operatively associated with the memory for determining phase relationships between the plurality of high voltage electrical lines.