Component Replenishment Management System for SMT Lines

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In component mounting lines, operators face inefficiencies in component replenishment work due to unpredictable timing for replenishing component supply devices, leading to confusion and reduced work efficiency when actual replenishment is not possible.

Innovation Solution

A component replenishment management system that monitors supply states, estimates replenishable time, acquires component type information, determines if replenishment is allowed, and provides guidance for operators on when to perform replenishment tasks, ensuring timely and efficient component replenishment.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If component replenishment work is performed based on predicted time zones, then the efficiency of component replenishment work is improved, but the operator may face confusion and reduced work efficiency when actual replenishment cannot be performed at the predicted time

Engineering Contradiction:
Improveefficiency of component replenishment workVSAvoidreliability of replenishment timing
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The system continuously monitors the supply state of components in real-time and compares actual consumption with predicted consumption. When deviations are detected (e.g., consumption is faster or slower than expected), the system automatically updates the replenishment timing predictions and notifies operators of any changes, ensuring the information provided to operators remains accurate and reliable.

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The system performs preliminary monitoring and prediction of component consumption patterns before replenishment is needed. By analyzing consumption trends in advance and updating predictions dynamically, the system prepares accurate replenishment timing information before operators need to act, preventing confusion and ensuring reliable guidance.

Inventive Principle:
Principle #10Preliminary action

2Device complexity

If component replenishment work is performed without real-time monitoring, then the system complexity is reduced, but the accuracy of replenishment timing prediction deteriorates

Engineering Contradiction:
Improvesimplicity of replenishment management systemVSAvoidaccuracy of replenishment timing prediction
Core Design Contradiction:
Device complexityVSMeasurement precision

Solution Approach 1:

The component supply devices are equipped with self-monitoring capabilities that automatically track component consumption without requiring external intervention. The system uses the devices' own data collection functions to generate replenishment predictions, eliminating the need for complex external monitoring infrastructure while maintaining high prediction accuracy.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The system dynamically adjusts prediction parameters based on actual consumption data. By continuously updating consumption rates and patterns based on real-time monitoring, the system adapts its predictions to match actual usage, improving accuracy without requiring overly complex fixed-parameter models.

Inventive Principle:
Principle #35Parameter changes

Data Source

PatentUS11778797B2Component replenishment management system and component mounting system
Publication Date: 2023.10.03 YAMAHA MOTOR CO LTD
  • US11778797B2 patent drawing
  • US11778797B2 patent drawing
  • US11778797B2 patent drawing

AI summary

In a component replenishment management system, a component supply monitoring unit estimates replenishable time, which represents time until component replenishment work becomes possible, for each of component supply devices. A work determination unit determines whether or not the component replenishment work can be actually performed at a timing at which replenishment component type information is acquired by an external input and output unit. In a case where the work determination unit determines that the component replenishment work cannot be performed, a work guidance unit generates performing process guidance information. The performing process guidance information is information for guiding a performing process based on the replenishable time of the component replenishment work.