Software Extension Resource Scanning for Stable Application Deployment

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In distributed computing environments, software operators can become unstable due to missing or incompatible resources, leading to performance degradation and latency, as these issues often only become apparent at runtime.

Innovation Solution

An operator management system that scans the cluster for required resources and fields before installation, generating a resource manifest to ensure their availability, and only deploys the operator if all necessary resources are present, thereby preventing instability and optimizing resource usage.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Extent of automation

If operators are deployed using OLM without pre-checking resource availability, then deployment automation is improved, but operator stability deteriorates due to missing or incompatible resources becoming apparent only at runtime

Engineering Contradiction:
Improvedeployment automationVSAvoidoperator stability
Core Design Contradiction:
Extent of automationVSReliability

Solution Approach 1:

The system performs preliminary scanning and validation of required resources and fields before operator installation. The operator management system extracts resource requirements from the operator's code base, scans the cluster to verify availability of these resources, and only then proceeds with installation. This preliminary action prevents runtime instability caused by missing resources while maintaining automated deployment.

Inventive Principle:
Principle #10Preliminary action

2Productivity

If operators are installed without scanning for required resources, then installation speed is improved, but performance degradation occurs due to resource incompatibility detected at runtime

Engineering Contradiction:
Improveinstallation speedVSAvoidoperator performance
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The system scans the cluster for required resources and validates field compatibility before operator installation. By extracting resource requirements from the operator's code base and verifying their availability in advance, the system ensures performance compatibility without significantly impacting installation speed, as the scanning occurs in parallel or during the installation preparation phase.

Inventive Principle:
Principle #10Preliminary action

3Reliability

If resource scanning is performed before operator installation, then operator stability is improved, but system complexity increases due to additional scanning and validation steps

Engineering Contradiction:
Improveoperator stabilityVSAvoiddeployment process complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The operator management system automatically extracts resource requirements from the operator's own code base and performs the scanning and validation without manual intervention. The system self-services by identifying what resources are needed, checking their availability, and making deployment decisions autonomously, which adds stability without requiring complex manual deployment processes.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The system implements feedback by scanning the cluster environment, comparing actual resource availability against required resources extracted from the operator's code base, and using this information to determine whether to proceed with installation. This feedback mechanism ensures stability by preventing installation when resources are incompatible or missing.

Inventive Principle:
Principle #23Feedback

4Loss of time

If operators are deployed without resource validation, then deployment time is reduced, but resource usage efficiency deteriorates due to failed deployments and retries

Engineering Contradiction:
Improvedeployment timeVSAvoidcomputing resource usage efficiency
Core Design Contradiction:
Loss of timeVSLoss of energy

Solution Approach 1:

The system performs resource validation in advance before deployment, preventing failed deployments and retries. By scanning for required resources and validating compatibility before installation, the system avoids wasting computing resources on operators that would fail at runtime, thereby improving overall resource usage efficiency despite the additional preliminary validation step.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS20250291574A1Controlling deployment of software applications by software extensions
Publication Date: 2025.09.18 RED HAT INC
  • US20250291574A1 patent drawing
  • US20250291574A1 patent drawing
  • US20250291574A1 patent drawing

AI summary

A system can be provided for controlling software application deployment based on resource data for an associated software extension. For example, the system can extract first resource data for a software extension from a code base of the software extension. The software extension can be used to deploy a software application. The system can further install the software extension at one or more computing clusters and can detect resource requests transmitted by the software extension during installation. The system may then generate second resource data for the software extension based on the resource requests. Additionally, the system can deploy, using the software extension, the software application at a computing cluster. The computing cluster can be selected based on the first resource data and the second resource data and the computing cluster can be separate from the one or more computing clusters.