Software Performance Maturity Evaluation Model

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional techniques for assessing software application performance fall short of evaluating the overall performance maturity, leading to software applications lacking expected performance capabilities.

Innovation Solution

A performance maturity evaluation model and system that assesses software applications based on key performance areas, using a structured approach with assessment parameters and sub-parameters, weightage assignment, and a questionnaire to determine a maturity score, providing a comprehensive evaluation across various development phases.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If conventional performance assessment techniques are used, then functional aspects of application development are monitored, but overall performance maturity cannot be evaluated

Engineering Contradiction:
Improveperformance maturity evaluationVSAvoidassessment model complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The assessment model is segmented into multiple hierarchical levels including key performance areas, assessment parameters, sub-parameters, and evaluation criteria. This segmentation allows comprehensive performance maturity evaluation while maintaining manageable complexity through structured breakdown of the assessment framework.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The patent introduces a multi-dimensional assessment framework that evaluates performance maturity across different dimensions (functional, non-functional, architectural, operational). This dimensional approach enables comprehensive evaluation without linearly increasing complexity, as each dimension contributes uniquely to the overall assessment.

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

2Reliability

If a comprehensive performance evaluation model is implemented, then performance maturity can be accurately assessed, but the complexity of the assessment process increases

Engineering Contradiction:
Improveperformance assessment accuracyVSAvoidevaluation system complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The evaluation system is divided into modular components with clear responsibilities: key performance areas define evaluation domains, assessment parameters specify measurement targets, sub-parameters provide detailed metrics, and evaluation criteria establish judgment standards. This modular segmentation ensures assessment accuracy while keeping each component relatively simple and manageable.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

Different parts of the assessment model are assigned different levels of detail and rigor appropriate to their specific function. Critical performance areas receive more granular sub-parameters and stricter evaluation criteria, while less critical areas use simplified assessment approaches. This local differentiation maintains overall reliability without uniformly increasing complexity across all assessment elements.

Inventive Principle:
Principle #3Local quality

Data Source

PatentUS9158663B2Evaluating performance maturity level of an application
Publication Date: 2015.10.13 TATA CONSULTANCY SERVICES LTD
  • US9158663B2 patent drawing
  • US9158663B2 patent drawing
  • US9158663B2 patent drawing

AI summary

Systems and methods for evaluating a performance maturity level of a software application are described herein. In an implementation, the method includes obtaining at least one assessment parameter and at least one sub-parameter of the at least one assessment parameter, based on at least one of a key performance area and a key competency area. Further, a weightage is assigned to the at least one sub-parameter, the weightage being based on significance of the at least one sub-parameter to the assessment parameter. In addition, a performance questionnaire is configured, based on the at least one assessment parameter and the at least one sub-parameter. Subsequently, a maturity score is determined for the software application, in response to inputs to the performance questionnaire, the maturity score being indicative of the performance maturity level of the software application.