Solar Table Rack Transport for Preassembled Farm Installation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The installation of large-scale solar panel systems is cost-prohibitive due to the complexity and inefficiency of individually assembling and installing thousands of solar panels across large areas, requiring significant material and labor resources, and inconsistent delivery and installation processes.

Innovation Solution

A centralized assembly and installation process using a mobile transport vehicle (MTV) that carries multiple preassembled solar tables, equipped with alignment capabilities, to efficiently transport and install solar tables at multiple points within a large-scale solar system, reducing the need for on-site assembly and improving transport efficiency.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If materials are delivered to deployment site via access road and processed by crew, then materials can be staged at deployment site, but the process becomes cost-prohibitive as system size increases

Engineering Contradiction:
Improveinstallation efficiencyVSAvoidinstallation complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

Solar tables are pre-assembled at a centralized facility before being transported to the deployment site. This preliminary assembly action eliminates the need for on-site assembly of individual panels, significantly reducing installation time and complexity while maintaining scalability for large systems

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

Multiple solar panels are merged into pre-assembled solar table units that can be transported and installed as single modules. This combining approach reduces the number of individual assembly operations required and enables more efficient material handling and installation processes

Inventive Principle:
Principle #5Merging (Combining)

2Ease of operation

If heavy equipment moves materials to specific locations for assembly, then installation can be performed at each location, but the repeated delivery and assembly process increases cost

Engineering Contradiction:
Improveinstallation easeVSAvoidinstallation speed
Core Design Contradiction:
Ease of operationVSProductivity

Solution Approach 1:

Solar tables are pre-assembled at a centralized facility before being transported to the deployment site. This preliminary assembly action eliminates the need for on-site assembly of individual panels, significantly reducing installation time and complexity while maintaining scalability for large systems

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

Pre-assembled solar tables serve as intermediary units between the centralized manufacturing facility and the final installation location. These intermediate modules simplify the installation process by arriving ready-to-install, reducing the need for on-site assembly operations and heavy equipment intervention

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentUS12606073B2Solar table mobile transport vehicle with rack
Publication Date: 2026.04.21 TERABASE ENERGY INC
  • US12606073B2 patent drawing
  • US12606073B2 patent drawing
  • US12606073B2 patent drawing

AI summary

Embodiments of a solar table mobile transport vehicle capable of carrying multiple solar tables are described. Multiple solar tables may be vertically stacked on a rack. Each solar table may be supported by a pair of cantilevered beams such that the solar table may be unloaded from the rack in an unobstructed manner. The rack may be loaded on a mobile transport vehicle for transportation to a point of installation. Solar tables in the rack may be fetched by the mobile transport vehicle or another installation rover for installation. Such a capability of carrying multiple solar tables increases the installation efficiency of solar tables, especially for large solar farm constructions.