Stackable Baffle Drop Shaft for Water Flow Control

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing construction methods for forming vertical shafts are complex, time-consuming, and hazardous, particularly when dealing with below-grade construction, as they require extensive labor and equipment to manage uncontrolled water flows, which can cause structural damage and safety risks due to unimpeded wastewater and stormwater flows.

Innovation Solution

A precast, stackable baffle drop shaft unit with a peripherally extending wall and medial channel, featuring preinstalled baffles and a locking mechanism, allowing for vertical stacking to impede uncontrolled water flow, reducing the need for on-site welding and minimizing labor costs by using identical body pieces with integrated seals and access means.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Strength

If cast in place method is used to form shafts, then structural integrity can be achieved, but construction complexity and time consumption increase significantly

Engineering Contradiction:
Improvestructural integrityVSAvoidconstruction complexity
Core Design Contradiction:
StrengthVSDevice complexity

Solution Approach 1:

The shaft is divided into multiple precast concrete segments that can be manufactured off-site and then assembled on-site. Each segment is cast separately with controlled conditions to ensure structural integrity, then joined together using connection elements. This segmentation allows the structural requirements to be met during controlled manufacturing while simplifying on-site construction to assembly operations only.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The concrete segments are precast off-site before the actual shaft assembly takes place. This preliminary action allows for optimized manufacturing conditions, quality control, and preparation of connection elements in advance. The segments are manufactured with embedded connection features that facilitate rapid on-site assembly, thereby reducing construction complexity and time while maintaining structural integrity.

Inventive Principle:
Principle #10Preliminary action

2Productivity

If precast planar wall panels are used, then construction speed can be improved, but worker safety risks and on-site welding requirements increase

Engineering Contradiction:
Improveconstruction speedVSAvoidworker safety risks
Core Design Contradiction:
ProductivityVSObject-affected harmful factors

Solution Approach 1:

The shaft construction is segmented into standardized precast concrete sections that are assembled like building blocks. Each section is manufactured with integrated connection elements that eliminate the need for on-site welding. This segmentation maintains high construction speed through efficient assembly while removing the hazardous welding operations from the worksite, thereby improving worker safety.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The connection between precast segments replaces welding operations with mechanical connection systems such as bolted flanges, interlocking features, or friction-fit joints. This substitution eliminates the harmful effects of welding (heat, fumes, sparks) while maintaining structural continuity. The mechanical connections are designed to be assembled quickly by workers using standard tools, preserving construction speed without compromising safety.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

3Productivity

If unimpeded water flow is allowed through shafts, then water transfer efficiency is maximized, but structural damage and corrosion occur due to excessive pressure and friction

Engineering Contradiction:
Improvewater transfer efficiencyVSAvoidstructural damage and corrosion
Core Design Contradiction:
ProductivityVSObject-affected harmful factors

Solution Approach 1:

The continuous water flow path is segmented by installing flow control elements such as baffles, weirs, or stepped structures within the shaft. These elements divide the unimpeded flow into controlled sequences of flow and dissipation zones. Water flows through defined paths that convert kinetic energy into controlled turbulence and dissipation at each segment, preventing excessive pressure buildup and friction while maintaining overall water transfer efficiency through the segmented structure.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The harmful kinetic energy and pressure of falling water are converted into beneficial flow control mechanisms. Baffles and flow distribution structures transform the destructive force of uncontrolled water flow into controlled flow patterns that enhance water transfer efficiency. The energy dissipation zones created by segmented flow paths reduce corrosion and structural damage while the structured flow paths maintain efficient water movement through the shaft system.

Inventive Principle:
Principle #22Blessing in disguise (Convert harm into benefit)

4Strength

If complex construction methods are used for below-grade shafts, then structural requirements can be met, but installation time and labor costs increase

Engineering Contradiction:
Improvestructural requirementsVSAvoidinstallation time
Core Design Contradiction:
StrengthVSLoss of time

Solution Approach 1:

The shaft structure is segmented into standardized precast concrete sections that are manufactured off-site with controlled conditions to ensure structural requirements are met. Each segment is prepared in advance with embedded connection elements, allowing rapid on-site assembly. This segmentation transforms complex on-site construction into simple assembly operations, dramatically reducing installation time while maintaining structural integrity through controlled manufacturing processes.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

All structural preparation, including reinforcement placement, concrete curing, and connection element installation, is performed in advance during the precasting phase. This preliminary action ensures structural requirements are satisfied under optimized manufacturing conditions before the segments arrive at the installation site. On-site work is reduced to simple assembly operations, minimizing installation time and labor costs while maintaining full structural compliance.

Inventive Principle:
Principle #10Preliminary action

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

The solution significantly reduces installation time and costs, enhances safety by minimizing worker exposure to hazardous conditions, and provides a durable, structurally sound shaft with reduced risk of damage from uncontrolled water flows, while allowing for efficient water management through controlled flow paths.

Implementation Method 1

stackable baffle drop shaft unit for impeding uncontrolled gravitational flow of water from a first level to a second level

Methodology Applied
Scientific EffectGravity: Gravitation

Implementation Method 2

a baffle that at least partially occludes a defined medial channel

Methodology Applied
Scientific EffectPhysical barrier obstruction: Physical Containment

Data Source

PatentUS11313116B2Stackable baffle drop shaft unit and method
Publication Date: 2022.04.26 EGGLESTON II RICHARD J
  • US11313116B2 patent drawing
  • US11313116B2 patent drawing
  • US11313116B2 patent drawing

AI summary

A stackable baffle drop shaft unit and method provides a pre-cast body that has a peripheral wall extending thereabout and having a top edge and an opposing bottom edge, the peripheral wall has an exterior facing surface and an opposing interior facing surface, and the body defines a medial channel extending therethrough between the top edge and the bottom edge. A baffle is carried by, and extends inwardly from the interior facing surface and partially across the medial channel defined by the body, and the baffle is positioned between the top edge and the bottom edge. The top edge and the bottom edge of the pre-cast body each define a portion of a positionally securing engagement and alignment means for positional and vertical alignment and stacking of plural units on top of one another. Vertical stacking of plural bodies forms a medial channel extending therethrough.