Stackable Self-Registering MF/J Boxes for Rapid Solar PV Installation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing systems for controlling and interfacing electrical and electro-mechanical devices in solar photovoltaic and other fields lack a fast and secure method for rapid installation, removal, and reconfiguration, particularly in emergency situations, and do not facilitate modular upgrades or connections.

Innovation Solution

A system of stackable self-registering, waterproof Multi-Function/Junction (MF/J) boxes and sleeves that allow for the easy addition, removal, and upgrading of devices, along with a central control panel for managing these devices, enabling rapid plug-and-play functionality and modular interfacing.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If traditional electrical junction boxes are used, then devices can be connected, but installation and reconfiguration are time-consuming and not rapid

Engineering Contradiction:
Improveinstallation speedVSAvoidtime for installation and reconfiguration
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The system divides the electrical junction functionality into separate stackable modules (J-boxes) that can be independently installed, removed, and reconfigured. Each module contains specific electrical components and can be stacked vertically, allowing rapid deployment without complex wiring operations.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The stackable J-box system enables dynamic reconfiguration of electrical connections by allowing modules to be easily added, removed, or repositioned on the stack. This dynamic architecture supports rapid adaptation to changing installation requirements without complete system reconfiguration.

Inventive Principle:
Principle #15Dynamics

2Adaptability or versatility

If devices are permanently installed, then system stability is maintained, but upgrades and modifications are difficult

Engineering Contradiction:
Improvemodular upgrading capabilityVSAvoidease of installation and maintenance
Core Design Contradiction:
Adaptability or versatilityVSEase of manufacture

Solution Approach 1:

The system segments the electrical system into discrete, standardized J-box modules that can be independently upgraded. Each module maintains standard connection interfaces, allowing new functionality to be added by stacking new modules without affecting existing installed modules.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The standardized stackable J-box design provides universal compatibility across different module types and configurations. A single stack interface standard allows various electrical components and devices to be integrated through the same connection mechanism, facilitating multi-functional system construction.

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Ease of repair

If complex connection systems are used, then electrical connections can be established, but the system becomes difficult to maintain and service

Engineering Contradiction:
Improveease of maintenance and serviceVSAvoidcomplexity of connection system
Core Design Contradiction:
Ease of repairVSDevice complexity

Solution Approach 1:

The connection system is segmented into standardized modular J-box units with uniform interfaces. This segmentation simplifies maintenance by allowing individual module replacement rather than complex multi-point reconfiguration, reducing the skill level and time required for servicing.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The stackable design with standardized interfaces enables field technicians to perform maintenance and upgrades without specialized training or complex tools. Modules can be easily identified, removed, and replaced following simple procedures, making the system self-servicing friendly.

Inventive Principle:
Principle #25Self-service

4Productivity

If rapid connection methods are implemented, then installation speed improves, but connection security and waterproofing may be compromised

Engineering Contradiction:
Improveinstallation speedVSAvoidconnection security and waterproofing
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The J-box modules are pre-assembled with integrated connection mechanisms and waterproof sealing elements before field installation. This preliminary preparation ensures that rapid stacking operations maintain secure electrical connections and environmental sealing without requiring complex field assembly procedures.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS10143101B2PV stax—multi-function junction MF/J system
Publication Date: 2018.11.27 MCCUNE CHUCK
  • US10143101B2 patent drawing
  • US10143101B2 patent drawing
  • US10143101B2 patent drawing

AI summary

A system to provide a multi-function connection capability to contain and provide for stacking, mounting self-registering Multi-Function Junction (MF/J) boxes that contain a multiplicity of control electronics and can be stacked, removed, replaced, and/or upgraded with a minimal of steps or connection processes in order to simplify methods and conserve on or add value, capabilities to materials and electrical/mechanical equipment. The system can be engaged or utilized by any EMS/First Responder/Service Technician, authorized personnel in any field, Contractor, manufacturer, BOS integrator and any assembler of systems that require a multiplicity of interfacing devices to be in proximity, connection or contact to each other.