Resource Staffing Manager with Dynamic Budget Visualization

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Manual resource search and staffing for project teams are time-consuming and inefficient, making it costly to fulfill resource demand profiles effectively.

Innovation Solution

A computer system provides a graphical user interface with pie and donut charts to dynamically search and allocate resources based on budget and schedule limitations, offering a Best Solution Staffing and Graphical Staffing approach to optimize resource selection for project teams.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If manual search is used to find resources for each role requirement, then resource staffing can be completed, but the process becomes time-consuming and inefficient

Engineering Contradiction:
Improveresource staffing efficiencyVSAvoidtime for manual resource search
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The patent replaces the manual mechanical search process with an automated computer-based system that uses algorithms to search the resource pool and generate staffing recommendations, eliminating the need for manual iteration through resource lists

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Solution Approach 2:

The system enables automatic resource identification and staffing recommendations without requiring manual intervention at each step, with the computer system autonomously processing resource demand profiles against the resource pool to generate optimized staffing proposals

Inventive Principle:
Principle #25Self-service

2Productivity

If manual resource search and staffing is performed, then resource allocation can be made, but the process becomes costly

Engineering Contradiction:
Improveresource allocation efficiencyVSAvoidcost of manual staffing process
Core Design Contradiction:
ProductivityVSLoss of energy

Solution Approach 1:

The patent replaces costly manual resource allocation processes with an automated computer-based system that performs searches, analyses, and generates staffing recommendations, reducing labor costs and operational expenses associated with manual staffing

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

3Reliability

If a comprehensive resource pool is maintained with detailed information, then better resource matching is possible, but the system complexity increases

Engineering Contradiction:
Improveresource matching accuracyVSAvoidsystem complexity for managing resource pool
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The patent uses a computer-based system to automatically manage and process the comprehensive resource pool, replacing manual management complexity with automated data processing, storage, and retrieval capabilities that handle detailed resource information efficiently

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Solution Approach 2:

The system creates a universal resource pool that can serve multiple project staffing needs, with the same comprehensive resource database being reused across different resource demand profiles and projects, amortizing the complexity management across multiple uses

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentUS10192181B2Resource demand-based project team staffing
Publication Date: 2019.01.29 ORACLE INT CORP
  • US10192181B2 patent drawing
  • US10192181B2 patent drawing
  • US10192181B2 patent drawing

AI summary

A resource staffing manager is provided that manages resource staffing of project teams. A resource demand profile is provided including requirements for roles to be staffed for a project team and an allocated budget for staffing the project team. Based on the resource demand profile, the manager displays a project level graphical user interface that includes a pie chart and a donut chart. The pie chart includes a slice for each of the roles and the donut chart indicates the amount of the allocated budget remaining. Upon selection of a resource to be staffed to one of the roles, the manager updates the slice of the pie chart corresponding to the role to graphically indicate that the selected resource has been selected to be staffed to that role. Based on the selection of the resource, the manager updates the donut chart to indicate the amount of the allocated budget remaining.