Staged Application Rollout via User Segmentation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

New versions of software applications often introduce unexpected errors or compatibility issues, affecting overall stability and user adoption, as they are typically rolled out to random user groups without ensuring that early adopters are targeted for testing.

Innovation Solution

A user segmentation system determines an early adopter probability based on application usage data, such as the number of screens and actions used, to assign users to staged rollout groups, ensuring that new versions are first tested by users likely to adopt new features effectively.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Speed

If new application versions are rolled out to random user groups, then the rollout process is simple and fast, but the stability and reliability of the application deteriorates due to unexpected errors and compatibility issues

Engineering Contradiction:
Improverollout speedVSAvoidapplication stability
Core Design Contradiction:
SpeedVSReliability

Solution Approach 1:

The user base is segmented into multiple staged rollout groups based on early adopter probability calculations. Users are divided into distinct cohorts that receive the new application version at different rates, allowing the system to balance rapid rollout with reliability testing. This segmentation enables controlled exposure of the application to varying user segments while maintaining overall rollout speed.

Inventive Principle:
Principle #1Segmentation

2Productivity

If new application versions are rolled out to all users immediately, then user adoption is maximized, but the impact of unexpected errors increases affecting overall stability

Engineering Contradiction:
Improveuser adoption rateVSAvoiderror impact
Core Design Contradiction:
ProductivityVSObject-affected harmful factors

Solution Approach 1:

The system performs preliminary action by calculating early adopter probability scores for each user before full rollout. Users are pre-sorted and staged into rollout groups based on their likelihood to adopt new features. This preliminary classification allows the system to deploy the application version to a controlled initial group for testing before expanding to the broader user base, thereby reducing the impact of potential errors.

Inventive Principle:
Principle #10Preliminary action

3Loss of information

If users are assigned to staged rollout groups based on early adopter probability, then feedback quality improves, but the system complexity increases

Engineering Contradiction:
Improvefeedback qualityVSAvoidsegmentation system complexity
Core Design Contradiction:
Loss of informationVSDevice complexity

Solution Approach 1:

The system implements self-service by automatically calculating early adopter probability scores for each user based on their historical application usage patterns. The segmentation and user assignment to staged rollout groups is performed autonomously by the system without manual intervention. This self-service approach maintains high feedback quality while managing system complexity through automated processes.

Inventive Principle:
Principle #25Self-service

4Measurement precision

If a small group of users is used for testing new versions, then validation feedback is more significant, but the rollout speed decreases

Engineering Contradiction:
Improvefeedback validationVSAvoidrollout speed
Core Design Contradiction:
Measurement precisionVSSpeed

Solution Approach 1:

The system applies dynamics by implementing a multi-stage rollout approach where the size of the testing group dynamically increases over time. Initially, a smaller group of high-probability early adopters is used for intensive validation. As the rollout progresses and validation is successful, the system dynamically expands to include larger user segments, thereby maintaining both measurement precision and rollout speed through adaptive scaling.

Inventive Principle:
Principle #15Dynamics

Data Source

PatentUS10496392B2Staged application rollout
Publication Date: 2019.12.03 MICRO FOCUS LLC
  • US10496392B2 patent drawing
  • US10496392B2 patent drawing
  • US10496392B2 patent drawing

AI summary

Examples include a user segmentation system for staged application rollout. In an example, an application usage engine receives data for users including a number of screens used in an application version and a number of user actions used in the application version. A staged rollout engine determines, for each user, an early adopter probability based on the number of screens used in the application version and the number of user actions used in the application version, and in some examples a preconfigured factor or weighting. For a subsequent application version, staged rollout groupings are determined. Users are assigned to staged rollout groupings based on the early adopter probabilities.