Structure-Supported Jackup System for Sea Ice Operations

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current jackup systems for offshore drilling are limited by their operability in ice-free seasons and require permanent, costly structures to withstand sea ice, making them inefficient and economically unviable for marginal locations with limited drilling activities.

Innovation Solution

A structure-supported jackup system comprising a main deck, movable legs, a cantilever, and derrick, with support base structures on the seabed and movable supports that allow the system to be assembled and disassembled, enabling operation in shallow waters and easy reconfiguration to avoid ice hazards, using caisson structures for enhanced ice resistance.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If a large dedicated drilling platform or combined drilling and production platform is used to resist ice loads all year round, then the system can operate in sea ice environments, but the structure becomes permanent and cannot be easily removed for reuse

Engineering Contradiction:
Improveice load resistanceVSAvoidremovability and reuse capability
Core Design Contradiction:
ReliabilityVSAdaptability or versatility

Solution Approach 1:

The system is divided into separate components: a permanent ice-resistant support base structure and a movable Jackup drilling unit. The support base structures remain on the seabed to withstand ice loads, while the drilling unit can be moved and repositioned as needed, resolving the contradiction between permanent ice resistance and removability.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

Movable supports act as intermediaries between the permanent support base structures and the Jackup drilling unit. These movable supports transfer loads while allowing the drilling unit to be repositioned, enabling both ice load resistance and operational flexibility.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Reliability

If a large dedicated drilling platform is used to resist ice loads, then the system can operate in sea ice environments, but the cost becomes prohibitive for marginal locations with limited drilling activities

Engineering Contradiction:
Improveice load resistanceVSAvoidcost effectiveness
Core Design Contradiction:
ReliabilityVSEase of manufacture

Solution Approach 1:

By segmenting the system into permanent support bases and movable drilling units, the expensive ice-resistant features are concentrated only where needed (at the support bases), rather than requiring the entire platform to be permanently ice-resistant. This reduces overall cost while maintaining reliability.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The movable Jackup drilling unit can be used across multiple locations and projects, effectively serving as a reusable asset rather than a permanent installation at each site. This reduces the cost per well for marginal locations.

Inventive Principle:
Principle #27Cheap short-living objects (Disposable)

3Productivity

If a normal Jackup system is used during ice free season, then the system can be operated, but the riser remains unprotected from ice hazards

Engineering Contradiction:
Improveoperability during ice free seasonVSAvoidriser protection from ice
Core Design Contradiction:
ProductivityVSObject-affected harmful factors

Solution Approach 1:

The support base structures serve as intermediary elements that provide a stable, protected platform for the drilling operations. By anchoring the system to these ice-resistant bases rather than relying solely on the Jackup legs, the riser and other critical components are protected from direct ice contact while maintaining operational flexibility during ice-free periods.

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentUS8899879B2Structure-supported jackup system
Publication Date: 2014.12.02 KEPPEL OFFSHORE & MARINE TECH CENT PTE LTD
  • US8899879B2 patent drawing
  • US8899879B2 patent drawing
  • US8899879B2 patent drawing

AI summary

A structure-supported Jackup system comprising a Jackup drilling unit with a main deck structure and a plurality of legs movably coupled with the main deck structure, two or more support base structures disposed on seabed, and a plurality of movable supports, wherein each of the plurality of movable supports is securely coupled with either the main deck structure or one of the two or more support base structure.