Studio Switcher Control Interface for Next Mode Data Management

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current studio equipment control systems face challenges in user operability, particularly in efficiently managing and transitioning between different video signal processing units and control data sets in a vision mixer setup.

Innovation Solution

A studio equipment control system is designed with a Next change operating section that allows users to easily modify the Next control data set and send corresponding control signals to the switcher, incorporating features like an edit GUI section, xpt button rows, transition operating sections with fader levers, and recall buttons to facilitate seamless transitions between OnAir and Next-use M/E states.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If a dedicated control panel is prepared for the vision mixer to manage video signal processing, then the control functionality is comprehensive, but the user operability and ease of operation deteriorate due to complex procedures for changing control data sets and transitioning between M/E units

Engineering Contradiction:
Improvecontrol functionalityVSAvoiduser operability
Core Design Contradiction:
ReliabilityVSEase of operation

Solution Approach 1:

The control system is segmented into distinct operational modes (OnAir mode and Next mode) with dedicated control sections. The Next change operating section allows users to prepare control data sets in advance without affecting current OnAir operations, separating the complexity of data management from the simplicity of execution.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system enables preliminary preparation of control data sets in the Next mode before they are needed for OnAir operation. Users can configure and store control parameters in advance, then quickly switch to using them without complex real-time adjustments, improving operational efficiency.

Inventive Principle:
Principle #10Preliminary action

2Adaptability or versatility

If multiple control data sets are managed for different M/E units, then the system can handle complex video switching scenarios, but the time required to change and transition between control data sets increases

Engineering Contradiction:
Improvevideo switching capabilityVSAvoidtransition time
Core Design Contradiction:
Adaptability or versatilityVSLoss of time

Solution Approach 1:

The system creates and stores copies of control data sets for different M/E units in the Next control data set memory. These copied data sets can be quickly recalled and activated without requiring time-consuming reconfiguration, enabling rapid transitions between different video switching scenarios.

Inventive Principle:
Principle #26Copying

Solution Approach 2:

The control system dynamically manages multiple control data sets with flexible switching between OnAir and Next modes. The system can adaptively transition between pre-prepared control configurations based on operational needs, reducing the time required for scenario changes while maintaining versatility.

Inventive Principle:
Principle #15Dynamics

Data Source

PatentUS11601604B2Studio equipment control system and method of controlling studio equipment control system
Publication Date: 2023.03.07 SONY GROUP CORP
  • US11601604B2 patent drawing
  • US11601604B2 patent drawing
  • US11601604B2 patent drawing

AI summary

To improve user operability.Provided is a Next change operating section that receives a changing operation on each item in a Next control data set being in a control state of a Next-use M/E of a switcher (vision mixer). When a changing operation is received in the Next change operating section, that is, when there is a changing operation, a control section changes contents of the Next control data set, and in accordance with the changed contents of the Next control data set, sends a control signal concerning the Next-use M/E to the switcher. A user can simply and easily change the contents of the Next control data set by operating the Next change operating section, and operability can be improved.