Sulfur-Modified Iron Reactor for Selenium Removal

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Surface coal mining operations in regions with selenium-containing rock result in runoff water with excessive selenium levels, exceeding permissible limits for discharge into lakes and streams, with no economically feasible remediation method available, particularly affecting the Appalachian region.

Innovation Solution

The use of a sulfur-modified iron (SMI) premix in an upflow reactor vessel to treat selenium-containing runoff water, followed by pH adjustment, filtration to remove dissolved iron, and periodic 'fluffing' to maintain the SMI bed's effectiveness, effectively reducing selenium levels to permissible limits.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If sulfur-modified iron (SMI) premix is used to remove selenium from runoff water, then selenium removal efficiency is improved, but the SMI bed becomes compacted and loses effectiveness over time

Engineering Contradiction:
Improveselenium removal efficiencyVSAvoidSMI bed structure stability
Core Design Contradiction:
ReliabilityVSStability of the object's composition

Solution Approach 1:

The patent implements periodic fluffing cycles where the SMI bed is expanded using upward water flow to reverse compaction. This periodic action restores the bed's porosity and active surfaces, maintaining selenium removal efficiency over extended operational periods without requiring bed replacement

Inventive Principle:
Principle #19Periodic action

2Productivity

If continuous flow treatment is used to process large volumes of runoff water, then productivity is improved, but the SMI bed compacts more rapidly

Engineering Contradiction:
Improvewater treatment throughputVSAvoidSMI bed service life
Core Design Contradiction:
ProductivityVSDuration of action of moving object

Solution Approach 1:

The system operates in continuous flow mode for water treatment but incorporates periodic fluffing cycles to prevent bed compaction. This alternating operation maintains high productivity while extending SMI bed service life through regular structural restoration

Inventive Principle:
Principle #19Periodic action

Solution Approach 2:

The patent maintains continuous water flow through the SMI bed for ongoing selenium removal while periodically interrupting with fluffing cycles. This ensures continuous treatment capability while preventing the detrimental effects of uninterrupted flow-induced compaction

Inventive Principle:
Principle #20Continuity of useful action

3Ease of operation

If the SMI bed is allowed to operate without maintenance, then operational simplicity is improved, but treatment effectiveness decreases due to bed compaction

Engineering Contradiction:
Improveoperational simplicityVSAvoidtreatment effectiveness
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

The system uses the treated water itself to fluff the SMI bed by directing upward flow through the bed during maintenance cycles. This self-service approach restores bed effectiveness without requiring external equipment or complex intervention, maintaining operational simplicity while ensuring treatment reliability

Inventive Principle:
Principle #25Self-service

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

The process efficiently removes selenium from runoff water to below 5 parts per billion, allowing safe discharge into lakes and streams, extending the life of the SMI bed through periodic expansion and refreshing of its active surfaces.

Implementation Method 1

This invention utilizes a sulfur-modified iron (SMI) premix similar to that produced in accordance with the above patents, in a reaction column to treat runoff water laden with selenium, in particular, selenate

Methodology Applied
Scientific EffectAdsorption: Adsorption

Implementation Method 2

The process is run in continuous flow

Methodology Applied
Scientific EffectChemical reaction: Chemical Bonding

Implementation Method 3

The system includes provision for 'fluffing' the SMI medium periodically, to expand the bed of SMI with a rapid flow of water through the medium

Methodology Applied
Scientific EffectFluidization: Fluidisation

Implementation Method 4

The treated water, low in selenium, can then be run through an oxidation tank and filtered to remove dissolved iron that is a residual from the SMI process

Methodology Applied
Scientific EffectOxidation: Oxidation

Data Source

PatentUS10059613B1Removal of contaminants from water
Publication Date: 2018.08.28 SANTINA PETER F
  • US10059613B1 patent drawing
  • US10059613B1 patent drawing
  • US10059613B1 patent drawing

AI summary

At coal mining sites rain runoff can be laden with selenium, in the selenate form. The selenium-containing runoff water is caught in ponds. Remediation of the pond water to remove selenate, or remediation of other contaminated water with selenium or other contaminants, is performed by treatment with sulfur-modified iron (SMI) in a contact bed of an upflow reactor vessel. The contaminated water after pretreatment is pumped through the SMI reactor, where the SMI removes selenium and/or other contaminants from the water. For extending effectiveness and life of the SMI the contact bed is either periodically “fluffed” with a high-flowrate upflow of water or gas through the bed, or moved continuously through the column in a continuous medium filtration system. In either event, a gas inert to SMI, such as nitrogen, can be used in fluffing the SMI or lifting the SMI as a continuously moving medium.