System and method for forming a full engagement male lock in a ductline

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing metal duct forming processes require significant manual labor to seal air leaks in Pittsburgh male lock seams due to incomplete engagement and material removal for corner notches, leading to inefficiencies and increased costs.

Innovation Solution

A metal forming apparatus that alters the corner cutting assembly to form a full engagement Pittsburgh male lock by delaying the formation of the male lock seam until after the connecting flange has been rolled, eliminating the need for initial notching and ensuring a complete, seamless duct through precise location and bending of the male lock seam.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of manufacture

If corner notches are removed from the male lock seam to allow connecting flange rolling, then the flange can be formed properly, but air leaks occur at the seam and require manual labor to seal

Engineering Contradiction:
Improveconnecting flange formationVSAvoidseam sealing
Core Design Contradiction:
Ease of manufactureVSReliability

Solution Approach 1:

The male lock seam is formed in advance before the connecting flange rolling operation, so that the seam is already in place and can be properly engaged. This preliminary formation of the male lock seam allows the subsequent flange rolling to proceed without creating gaps or air leaks, eliminating the need for manual sealing while maintaining both manufacturability and reliability

Inventive Principle:
Principle #10Preliminary action

2Reliability

If the male lock seam is formed before connecting flange rolling, then the seam can be properly engaged end-to-end, but the process complexity increases

Engineering Contradiction:
Improveseam engagementVSAvoidforming process sequence
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The forming process is divided into distinct sequential stages: first forming the male lock seam, then rolling the connecting flange. This segmentation allows each operation to be optimized independently while ensuring proper engagement. The male lock seam forming is completed as a separate preliminary step, creating a ready-to-engage structure that simplifies the overall process control and reduces complexity

Inventive Principle:
Principle #1Segmentation

3Ease of manufacture

If traditional corner cutting is used to allow flange rolling, then the flange can be formed, but material is removed that prevents full engagement of the male lock seam

Engineering Contradiction:
Improveflange rollingVSAvoidmale lock seam engagement
Core Design Contradiction:
Ease of manufactureVSManufacturing precision

Solution Approach 1:

The male lock seam is formed completely before the flange rolling operation begins. This preliminary action ensures that the full-length male lock seam is in place with proper engagement capability. The flange rolling then proceeds without removing any material from the seam area, preserving the complete engagement surface and achieving full precision end-to-end sealing

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS20240401726A1System and method for forming a full engagement male lock in a ductline
Publication Date: 2024.12.05 MESTEK MACHINERY INC
  • US20240401726A1 patent drawing
  • US20240401726A1 patent drawing
  • US20240401726A1 patent drawing

AI summary

The present invention provides a method for producing a full engagement Pittsburgh male lock using specific cutting assemblies and protocols that reduce the amount of metal that is removed from the male portion of the corner notches in the duct. Forming of the male portion of the lock is done after the connecting flange forming has been completed as opposed to before the connecting flange forming has been completed.