Task-Based Process Definition for Role-Based Workflow Guidance

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Complex user interfaces in business organizations lead to a steep learning curve for tasks, resulting in inefficiencies and inconsistencies due to buried functionalities and lack of clear best practices, especially in multi-task processes that require division among individuals.

Innovation Solution

A facility that guides users through tasks by defining processes, associating tasks with user roles, and providing step-by-step instructions, allowing administrative users to distribute tasks and ensure completion according to organizational best practices, with features like task inboxes and role-based interfaces.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If sophisticated user interfaces with pre-defined screens and viewing components are used to facilitate business processes, then data entry and retrieval capabilities are improved, but the learning curve for tasks becomes steeper and functionality becomes buried within sub-tabs

Engineering Contradiction:
Improvedata entry and retrieval capabilityVSAvoidlearning curve
Core Design Contradiction:
ProductivityVSEase of operation

Solution Approach 1:

The patent segments complex business processes into discrete, manageable tasks with clear boundaries. Each task is defined with specific start and end points, associated roles, and required actions. This segmentation allows users to focus on one task at a time rather than navigating complex interfaces, thereby maintaining data entry capabilities while reducing the learning curve through simplified, task-oriented presentation.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system performs preliminary action by pre-defining tasks, their sequences, associated roles, and required actions before users encounter them. Task metadata including descriptions, instructions, and relationships are prepared in advance, allowing users to receive contextual guidance exactly when needed rather than searching through interfaces. This preliminary structuring improves ease of operation while preserving comprehensive data handling capabilities.

Inventive Principle:
Principle #10Preliminary action

2Productivity

If extensive training is provided to employees to handle complex user interfaces, then task completion capability is improved, but training costs and time consumption increase

Engineering Contradiction:
Improvetask completion capabilityVSAvoidtraining time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The patent implements self-service by embedding instructional content, task descriptions, and guidance directly within the task interface. Users can access contextual help, step-by-step instructions, and role-specific information without external training. The system serves itself by providing all necessary knowledge internally, enabling users to become productive immediately while maintaining high task completion capabilities through built-in guidance mechanisms.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The system provides continuous feedback to users through task status indicators, completion notifications, and role-based updates. When tasks are assigned, completed, or require attention, the system automatically notifies relevant users and provides contextual information about what actions are needed. This feedback mechanism replaces extensive training by enabling users to learn through actual task execution and system guidance rather than memorizing interface complexities.

Inventive Principle:
Principle #23Feedback

3Adaptability or versatility

If manual notice provision is required between task participants in multi-task processes, then role-based task distribution is achieved, but unnecessary steps are added and task coherence is reduced

Engineering Contradiction:
Improverole-based task distributionVSAvoidprocess complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The patent merges task management and notification functions into a single automated system. Instead of separate manual notice-provision steps between roles, the system combines task assignment, status tracking, and automatic notification into one integrated workflow. When a task is assigned to a role or reaches a milestone, the system automatically notifies relevant participants, eliminating redundant manual steps while maintaining flexible role-based distribution and reducing overall process complexity.

Inventive Principle:
Principle #5Merging (Combining)

Data Source

PatentUS8893149B2Task-based process definition
Publication Date: 2014.11.18 SIEBEL SYSTEMS INC
  • US8893149B2 patent drawing
  • US8893149B2 patent drawing
  • US8893149B2 patent drawing

AI summary

A facility for guiding users through a series of steps or tasks, often associated with a process, is described. The facility assigns tasks or steps to users having roles identified with the task or step. The role associated with the task or step may change depending on the state of the task or step. When the role associated with a task or step changes, the facility may assign the task or step to another user. The facility guides a user through a task or step by providing instructions and other information, such as data tables and user input fields, that may be used to complete the task or step. The facility provides for the definition of processes by allowing users to specify tasks, steps and instructions relating to processes.