Tension Frame for Riser Systems with Pre-installed Pressure Control

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The installation and de-installation of pressure control equipment in tension frames for riser systems in hydrocarbon exploration and production is time-consuming and risky due to vertical relative motion between the tower and the riser, necessitating a solution for faster and more efficient operations.

Innovation Solution

A tension frame with pre-installed pressure control equipment units for both wire line and coiled tubing operations, allowing for quick activation and parking of either unit on either side of the riser center, reducing the need for frequent installation and de-installation on the surface flow tree.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If pressure control equipment is installed on the surface flow tree during wire line and coiled tubing operations, then the operations can be performed, but the installation and de-installation process is time-consuming and risky due to vertical relative motion between the tower and the riser

Engineering Contradiction:
Improveoperation speedVSAvoidinstallation time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The tension frame is equipped with pressure control equipment units that are pre-installed and parked in ready-to-use positions before operations begin. This preliminary preparation eliminates the need for time-consuming installation during actual wire line and coiled tubing operations, directly resolving the contradiction between operational capability and installation time.

Inventive Principle:
Principle #10Preliminary action

2Ease of operation

If pressure control equipment is installed on the surface flow tree, then wire line and coiled tubing operations can be conducted, but the frequent installation and de-installation increases operational risk due to vertical relative motion

Engineering Contradiction:
Improveoperation simplicityVSAvoidoperational safety
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

The tension frame serves as an intermediary structure that hosts multiple pressure control equipment units. This intermediary platform allows operations to be conducted without repeatedly installing and de-installing equipment on the surface flow tree, thereby reducing operational risks associated with vertical relative motion while maintaining ease of operation.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Productivity

If pressure control equipment is pre-installed in the tension frame, then installation time is reduced, but the tension frame structure becomes more complex

Engineering Contradiction:
Improveoperation efficiencyVSAvoidtension frame structure
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The tension frame is designed with multi-functionality to host multiple pressure control equipment units simultaneously. This universal design allows the same structural platform to support different types of pressure control equipment for both wire line and coiled tubing operations, improving productivity while managing structural complexity through versatile, standardized mounting arrangements.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentUS8961072B2Tension frame
Publication Date: 2015.02.24 AKER OILFIELD SERVICES OPERATION AS
  • US8961072B2 patent drawing
  • US8961072B2 patent drawing
  • US8961072B2 patent drawing

AI summary

A tension frame (2) for its application in a riser system for hydrocarbon exploration and production. The tension frame is (2) installed on a well control unit (5) atop at least one riser (9) in said riser system. The frame is adapted to receive a pressure control unit and hold it in line with the centre of the riser. The tension frame (2) houses at least two pre-installed pressure control equipment units (3, 4) of which one at a time is adapted to be hold at an active position, in which the unit is in line with the centre of the riser, and the other is adapted to be kept in a parked position within the frame.