Project Testing Work Unit Cost Transparency System

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current software testing methods lack transparency in cost management and resource allocation, making it difficult for customers to understand where and how cost savings are achieved during the testing process.

Innovation Solution

A method and system that determine the number of work units required for project testing, associating each unit with a cost value, and provide information on variations in work units at each phase to the customer, improving transparency and resource management.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Loss of energy

If conventional methods reduce manpower to lower cost, then cost is reduced, but transparency in cost management and resource allocation is lost

Engineering Contradiction:
ImprovecostVSAvoidtransparency in cost management
Core Design Contradiction:
Loss of energyVSLoss of information

Solution Approach 1:

The system implements feedback by continuously monitoring work unit consumption across different testing phases and providing real-time cost information to customers. This allows customers to see exactly where and how costs are incurred, maintaining transparency while enabling cost reduction through informed decision-making about resource allocation and testing phase optimization.

Inventive Principle:
Principle #23Feedback

2Loss of energy

If managed delivery is used to reduce operational cost, then cost savings are achieved, but transparency information about cost savings and resource management is not provided

Engineering Contradiction:
Improveoperational costVSAvoidtransparency information about cost savings
Core Design Contradiction:
Loss of energyVSLoss of information

Solution Approach 1:

The system provides continuous feedback to customers about work unit consumption, cost accumulation, and resource utilization across different testing phases. This transparency enables customers to understand exactly how cost savings are achieved through efficient resource management while maintaining the benefits of managed delivery pricing models.

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The system segments cost information by testing phases, work units, and resource types, allowing customers to see detailed breakdowns of where costs are incurred and where savings are achieved. This segmented view provides granular transparency while maintaining overall cost control through the managed delivery model.

Inventive Principle:
Principle #1Segmentation

3Loss of time

If work units are reduced to speed up delivery, then delivery time is reduced, but cost transparency and resource management visibility are compromised

Engineering Contradiction:
Improvedelivery timeVSAvoidcost transparency
Core Design Contradiction:
Loss of timeVSLoss of information

Solution Approach 1:

The system provides real-time feedback on work unit consumption and cost accumulation as testing progresses through different phases. This enables fast delivery by allowing stakeholders to make quick, informed decisions about resource allocation and phase completion while maintaining full visibility into cost implications of delivery acceleration decisions.

Inventive Principle:
Principle #23Feedback

Data Source

PatentUS10001973B2Method and system for improving testing services in a project testing environment
Publication Date: 2018.06.19 WIPRO LTD
  • US10001973B2 patent drawing
  • US10001973B2 patent drawing
  • US10001973B2 patent drawing

AI summary

The present disclosure relates to a method and system for improving testing services in a project testing environment. In an embodiment, the method comprises receiving input data of one or more requirements of a project from a user device. Based on the input data, the number of work units is determined. The work units are associated with the cost value. The work units are determined for each phase of the project testing. During execution of each phase of project testing there is variation in the number of work units. The information associated with the variation in the number of work units is provided to a user device.