Tiered Post Support Device for Single-Person Concrete Setting

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The current process of setting posts or piles in concrete-filled footing holes is labor-intensive and requires two builders, one to suspend the post and another to construct and maintain the stabilizing framework, which is cumbersome, especially for heavy or tall posts.

Innovation Solution

A support device comprising a lower tier and an upper tier separated by support walls, allowing the post or pile to be suspended and stabilized, enabling one builder to set and concrete the posts without additional support, with the device being adaptable for various post profiles and sizes.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If one builder holds the post or pile while another constructs a stabilizing framework, then the post can be stabilized in position, but the process becomes labor-intensive and requires multiple workers

Engineering Contradiction:
Improvepost stabilizationVSAvoidsetting process efficiency
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The support device is self-stabilizing through its tiered structure with support walls that distribute loads and provide inherent stability. The device supports itself and the post simultaneously, eliminating the need for external framework and multiple workers.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The support device acts as an intermediary between the post and the ground, providing a stable transition structure. The tiered design with support walls creates an intermediate platform that stabilizes the post without requiring additional framework.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Strength

If a stabilizing framework of timber and braces is constructed, then heavy or tall posts can be prevented from toppling, but the device complexity and time required increase

Engineering Contradiction:
Improvepost support capacityVSAvoidframework structure
Core Design Contradiction:
StrengthVSDevice complexity

Solution Approach 1:

The support device is divided into multiple tiers with support walls between them. This segmentation creates a modular structure that provides strength through distributed support rather than a single complex framework.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The tiered structure adds vertical dimensionality to the support system. Instead of a planar framework, the device uses stacked tiers with support walls to create three-dimensional stability that handles heavy and tall posts effectively.

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

3Measurement precision

If a builder checks post location while keeping it suspended, then positioning accuracy can be maintained, but the builder cannot relieve until concrete hardens

Engineering Contradiction:
Improvepost location accuracyVSAvoidbuilder availability
Core Design Contradiction:
Measurement precisionVSLoss of time

Solution Approach 1:

The support device maintains the post in the correct suspended position autonomously through its structured design. The tiered configuration with support walls inherently keeps the post centered and at the proper height, freeing the builder to perform other tasks.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The support device is prepared in advance with its tiered structure designed to automatically maintain proper post positioning. This preliminary configuration ensures the post remains accurately positioned without requiring continuous builder intervention during concrete setting.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS10267007B2Post support device
Publication Date: 2019.04.23 SUB BASE BUILDING TECH
  • US10267007B2 patent drawing
  • US10267007B2 patent drawing
  • US10267007B2 patent drawing

AI summary

A support device adapted to support the base of a post or pile above the base of a foot hole excavated in preparation for pouring concrete having a lower tier adapted to contact the base of the foot hole and provide a support surface and an upper tier adapted to provide a post or pile supporting platform. The lower tier and the upper tier are separated by one or more support walls that define a region beneath the base of the post or pile to be filled with concrete.