Tile Spacing Tool Spanning Decorative Insert Gaps

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing tile spacing methods are impractical for wall designs with decorative inserts that cannot support the weight of additional rows, requiring waiting for adhesive to dry before installing upper tile rows, which delays the tiling process.

Innovation Solution

A tile spacing tool with an elongated support rod and adjustable circular plates that span the gap between tile rows, allowing weight transfer from upper rows to lower rows without waiting for adhesive to dry, enabling simultaneous installation of the entire wall.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Shape

If decorative inserts are used in wall designs, then aesthetic appearance is improved, but the ability to support upper tile rows is lost

Engineering Contradiction:
Improveaesthetic appearanceVSAvoidload bearing capacity
Core Design Contradiction:
ShapeVSStrength

Solution Approach 1:

A support rod acts as an intermediary element between the decorative insert and the upper tile rows. The support rod spans across the decorative insert, transferring the weight of upper tile rows to adjacent tiles that can bear the load, while the decorative insert maintains its aesthetic function without structural responsibility

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The support system is segmented into multiple independent support rods distributed across the wall. Each support rod handles the load locally above a decorative insert, allowing the decorative elements to remain non-structural while maintaining overall wall integrity

Inventive Principle:
Principle #1Segmentation

2Ease of manufacture

If adhesive is used to attach decorative inserts, then installation simplicity is improved, but installation time is increased due to waiting for curing

Engineering Contradiction:
Improveinstallation simplicityVSAvoidinstallation time
Core Design Contradiction:
Ease of manufactureVSLoss of time

Solution Approach 1:

Support rods are installed preliminarily before the adhesive fully cures. This allows upper tile rows to be placed immediately without waiting for the adhesive to set, as the support rods provide temporary load-bearing capability during the curing process

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The support rod serves as a temporary intermediary load-transfer mechanism that bridges the gap between adhesive application and full curing, enabling continuous construction workflow without time loss

Inventive Principle:
Principle #24Intermediary (Mediator)

3Strength

If support rods are added to span gaps, then load bearing capacity is improved, but device complexity is increased

Engineering Contradiction:
Improveload bearing capacityVSAvoidstructural complexity
Core Design Contradiction:
StrengthVSDevice complexity

Solution Approach 1:

The support rods are designed as simple, inexpensive, temporary components that are easily installed and removed. Their simplicity compensates for the added structural element, and they are discarded after serving their temporary load-bearing function during construction

Inventive Principle:
Principle #27Cheap short-living objects (Disposable)

Solution Approach 2:

The support function is extracted from the decorative inserts themselves and placed into separate, dedicated support rods. This allows the decorative elements to remain simple and aesthetic while the structural function is handled by specialized but simple support components

Inventive Principle:
Principle #2Taking out (Extraction)

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

Enables the construction of walls with decorative inserts by transferring the weight of upper tile rows to lower rows, allowing for quicker installation and removal of spacers after mortar curing, reducing the overall installation time.

Implementation Method 1

at least one of the support plates can be rotated and threaded along the support rod to adjust the spacing between the plates

Methodology Applied
Scientific EffectThreading mechanism: Screw

Implementation Method 2

The spacing tool spans the gap to contact the adjacent tile rows and transfer the weight of the upper tile rows across the gap to the lower tile rows

Methodology Applied
Scientific EffectWeight transfer: Gravitation

Data Source

PatentUS10961723B2Tile spacing tool and method
Publication Date: 2021.03.30 WILLIAMS GORDON
  • US10961723B2 patent drawing
  • US10961723B2 patent drawing

AI summary

A tile spacing tool is disclosed herein that spans a gap between tile rows where the gap is sized to receive a decorative insert or the like. The spacing tool spans the gap and transfers the weight of the upper tile rows across the gap to the lower tile rows, which are supported by a floor or ledge. As a result, the entire wall can be built including the decorative insert without waiting for the bottom tile rows to dry to support the weight of the tile rows above the decorative insert.