Problem
Tire production plants face the challenge of needing to quickly adapt to changes in tire orders and new regulations without interrupting production, as existing methods require complete factory shutdowns for upgrades.
Innovation Solution
A method for replacing processing units during uninterrupted tire production, involving preparing a P-type PR element, installing a UN unit, and redirecting the SE stream to the UN unit without interruption, allowing for partial processing and quality improvement.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Adaptability or versatility
If processing units are replaced during tire production plant modernization, then production adaptability and regulatory compliance are improved, but production interruption and factory shutdown are required
Solution Approach 1:
The patent applies preliminary action by installing and preparing the new processing unit (UN) in advance before it is needed for production. The UN unit is installed at a location allowing passage of the SE stream, put in ready-to-operate state, and only then is the SE stream redirected from UR to UN, enabling seamless transition without production interruption
Solution Approach 2:
The patent uses an intermediary approach by having both the old processing unit (UR) and new processing unit (UN) operate in parallel temporarily. The SE stream can be redirected between them without complete shutdown, allowing the transition to be mediated through dual-unit operation rather than direct replacement
2Ease of manufacture
If processing units are replaced by shutting down the plant, then equipment upgrade is achieved, but production loss and job relocation risk increase
Solution Approach 1:
The patent maintains continuity of useful action by ensuring the tire production process never stops during processing unit replacement. The method redirects the SE stream from UR to UN while both units can operate, and the replacement occurs without interrupting the continuous production flow, eliminating production loss
3Adaptability or versatility
If the entire factory is reconstructed for modernization, then new regulations are met, but environmental destruction and economic cost increase
Solution Approach 1:
The patent applies segmentation by replacing only the specific processing unit (UR to UN) that needs upgrading rather than reconstructing the entire factory. The replacement is localized to a single unit while other parts of the production plant continue operating, minimizing environmental destruction and economic cost
Data Source
Figure 1~2
Figure 3~4
AI summary
The present invention relates to a method for replacing a processing unit for preparing a tire element, the element being of type P, during an uninterrupted process of tire production in a tire production plant and a method for modernizing a tire plant comprising replacements of processing units, these replacements being carried out according to said replacement method of the present invention. Furthermore, the present invention relates to a tire production method using the method according to the present invention and a tire production plant for carrying out said method.