Top-Mounted Hoist Single-Layer Drum Drill Line Fatigue
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
Existing drawworks systems in oil and gas drilling rigs face challenges with drill line fatigue and wear due to the large diameter of the drill line, which increases wear and tear on the winch drum and mast, especially when lifting heavy loads, leading to reduced drill line life and the need for frequent slip-and-cut operations.
Innovation Solution
A top-mounted hoisting system with a single-layer winch drum located at the uppermost end of the derrick or drilling mast, where each wrap of the drill line is on the same level, and powered by electric or hydraulic motors, reducing the load on the mast and eliminating the need for slip-and-cut operations by distributing the load more efficiently.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Power
If the drill line diameter is increased to lift heavier loads, then the load lifting capacity is improved, but the wear and tear on the winch drum and mast increases
Solution Approach 1:
The patent transitions from a floor-mounted winch drum configuration to a top-mounted hoist configuration, changing the spatial dimension of the system. This repositioning allows the drill line to be reeved through sheaves at the top of the mast, reducing the mechanical advantage requirements and thereby reducing wear on the winch drum and mast while maintaining the ability to lift heavy loads
2Power
If the drill line runs through multiple sheaves to gain mechanical advantage, then the load lifting capability is improved, but the drill line fatigue life is reduced
Solution Approach 1:
The patent changes the mechanical advantage parameter from a high ratio (8-16 times) achieved through multiple sheaves to a lower ratio achieved through a single-layer winch drum configuration. This parameter change reduces the number of times the drill line passes through sheaves, thereby reducing fatigue cycles and extending drill line life while maintaining load lifting capability
3Area of stationary object
If the winch drum is floor-mounted to save space at the top, then the space utilization is improved, but the mast load is increased
Solution Approach 1:
The patent inverts the conventional floor-mounted winch drum configuration by mounting the winch drum at the top of the mast. This inversion changes the force distribution in the system, allowing the mast to support the winch drum weight directly and reducing the dynamic loads from drill line tension, while the drill floor space is freed up for other equipment
Applied Scientific Principles
This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.
Function Achieved in This Case
This configuration extends the life of the drill line, reduces the load on the drilling mast, and eliminates the need for slip-and-cut operations, while also providing a more efficient and cost-effective solution by minimizing the space required on the drill floor and reducing the overall length of the drill line needed.
Implementation Method 1
powered by electric or hydraulic motors
Implementation Method 2
powered by electric or hydraulic motors
Implementation Method 3
A top-mounted hoisting system with a single-layer winch drum located at the uppermost end of the derrick or drilling mast, where each wrap of the drill line is on the same level
Implementation Method 4
reduces the load on the mast
Data Source
AI summary
Embodiments of a top-mounted hoisting system include a single-layer winch drum located at an uppermost end of a derrick or drilling mast, a drill string handling tool, and one or more drill lines extending from the single layer winch drum to the drill string handling tool. The drill string handling tool may be a top drive. When the drill line is connected directly to the lifted load, the drill line experiences far less load cycles than when the line runs through crown and travelling blocks. If the drum diameter is large enough, cut-and-slip operations may be eliminated, and the drill line may be replaced at longer time intervals. Embodiments provide for lower weight and may provide lower cost as a result. The top-mounted drum does not take up any space on the drill floor and less total length of drill line is also required than if the drum was floor-mounted.


